  1. Prepare and plan commissioning/decommissioning of gas distribution pipelines
  2. Carry out commission/decommission gas of distribution pipelines
  3. Inspect test and notify completion of commissioning/ decommissioning of gas distribution pipeline work

Required Skills

This describes the essential skills and knowledge and their level required for this unit

Evidence shall show that knowledge has been acquired of safe working practices for the commissioningdecommissioning of gas distribution pipelines

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies

KSGB

Distribution pipeline testing commission and decommission

G

Consult appropriate persons to coordinate work and persons in a Gas Industry workplace

Evidence shall show an understanding of consulting appropriate persons to coordinate work and persons for Gas Industry pipelines Distribution indicated by the following

personnel requirements for an order

reporting structures for equipment faults and dangerous work

communication with appropriate persons customers and third parties

strategies to facilitate coordination or work with other persons

requirements for and use of qualified specialists

G

Obtain and check materials tools and equipment necessary to complete the work

Evidence shall show an understanding of the checking of materials and tools to complete work on Gas Industry pipelines Distribution indicated by the following

Relevant OHS and environmental requirements in relation to obtaining and organising required materials

Understanding of component specificationstools and equipment for application

Correctly follow procedures to identify pipes fittings purge substances

equipment correctly interpreted and apply purge volume and time tables and charts

G

Develop plans for commissioning and decommissioning

Evidence shall show an understanding of the preparation of plans for commissioning and decommissioning for gas industry pipelines Distribution indicated by the following

Identify environmental and safety hazards assess risks and implement control measures

Preparation of plans that consider nonroutine procedures or unplanned events

Preparation of plans that are logical in sequence

Preparation of plans that include purge procedures

Preparation of plans that ensure security of supply

G

Liaise and communicate with relevant authorities

Evidence shall show an ability to liaise with relevant authorities in preparation of plans for commissioningdecommissioning Gas Industry pipelines Distribution specifically

Legislative OHS and environmental requirements applicable to a specific commissioningdecommissioning of a pipeline

Authorities that need to be contacted when planning the commissioningdecommissioning of pipeline

Requirements and procedures to obtain approvalspermits from relevant authorities

Requirements for advising relevant authorities of intended activities

Accurate and complete records of all communications with relevant authorities

G

Take distribution pipeline offline and bring distribution pipeline online

Evidence shall show an understanding of how to take the distribution pipeline system off line for decommissioning and bring online for the commissioning or recommissioning of Gas Industry pipelines Distribution specifically

Identify environmental and safety hazards assess risks and implement control measures

Undertake procedures for establishing and maintaining a safe workplace to relevant OHS and environmental requirements

Notify affected customers in accordance with procedures

Apply relevant procedures for bringingtaking pipeline system onoff line

Apply site emergency procedures ensuring they are reviewed and are current

Undertake procedures for fitting bypass apparatus ensuring continuity of supply

Undertake Stopping Off and Isolation of Pipelines using internal and external stop off equipment

Undertake procedures for purging the pipe system using a variety of media and testing procedures

Undertake procedures for testing and sealing of pipelines

G

Monitor and respond to anomalies whilst commissioning andor decommissioning operations

Evidence shall show an ability to make the required system adjustments for commissioning decommissioning of a Gas Industry pipelines Distribution indicated by the following

Identify Environmental and Safety Hazards assess risks and implement control measures

analyse effect of activities on Distribution System

undertake monitoring of system pressure at appropriate locations depending on network design and operating conditions

follow procedures for regulating and maintaining system pressures during commissioning and decommissioning activities

respond to equipment faults and deficiencies in accordance with procedures

G

Prepare reports

Evidence shall show an understanding of the preparation of reports applicable to the commissioning and decommissioning of Gas Industry pipelines Distribution indicated by the following

Apply procedures and legislative requirements for maintaining appropriate reporting and recording systems

Complete job records and process information to appropriaterelevant department

Recorded nonconformances and incidents including customer outages in accordance with procedures and legislative requirements

G

Select and use appropriate tools and equipment to test the pipeline system in accordance with procedures and legislative requirements

Evidence shall show an understanding of the selection and use of the appropriate tools and equipment to test pipeline systems in accordance with the appropriate procedures and legislative requirements indicated by the following

Appropriate tools and equipment to use for testing pipeline systems

Use of appropriate test equipment and test substances to accurately test adjust calibrate and repair systems

Interpreting test results to determine appropriate action

Records of all test results in accordance with procedures and legislative requirements

G

Undertake final inspections

Evidence shall show an understanding of the inspection process in commissioning and decommission of Gas Industry pipelines Distribution indicated by the following

Identification of the code requirements that must be met

Follow procedures to monitor valves and regulators

Follow procedures and assess the quality of work

G

Notify completion of work

Evidence shall show an understanding of the evidence required for the notification of the completion of work in the commissioningdecommissioning of Gas Industry pipelines Distribution indicated by the following

Complete and process documentation when the work is completed

Notify appropriate authoritiescouncils in relation to site reinstatement requirements using appropriate documentation

Record and complete amendments to drawings and plans as required

Record and report system condition in accordance with procedures

Sign off risk assessments and work permits as required by procedures

Evidence Required

The Evidence Guide forms an integral part of this Unit and shall be used in conjunction with all components parts of the unit and performed in accordance with the Assessment Guidelines of this Training Package

Overview of Assessment

Longitudinal competency development approaches to assessment such as Profiling require data to be reliably gathered in a form that can be consistently interpreted over time This approach is best utilised in Apprenticeship programs and reduces assessment intervention It is the Industrys preferred model for apprenticeships However where summative or final assessment is used it is to include the application of the competency in the normal work environment or at a minimum the application of the competency in a realistically simulated work environment It is recognised that in some circumstances assessment in part or full can occur outside the workplace However it must be in accord with Industry regulatory policy in this regard

Methods chosen for a particular assessment will be influenced by various factors These include the extent of the assessment the most effective locations for the assessment activities to take place access to physical resources additional safety measures that may be required and the critical nature of the competencies being assessed

The critical safety nature of working with electricity electrical equipment gas or any other hazardous substancematerial carries risk in deeming a person competent Hence sources of evidence need to be rich in nature so as to minimise error in judgment

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its richness Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package

Critical aspects of evidence required to demonstrate competency in this unit

Before the critical aspects of evidence are considered all prerequisites shall be met

Evidence for competence in this unit shall be considered holistically Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the Assessment Guidelines UEG Evidence shall also comprise

A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline work function and industrial environment In particular this shall incorporate evidence that shows a candidate is able to

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range

Apply sustainable energy principles and practices as specified in the Performance Criteria and range

Demonstrate an understanding of the essential knowledge and associated skills as described in this unit to such an extent that the learners performance outcome is reported in accordance with the preferred approach namely a percentile graded result where required by the regulated environment

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant anti discrimination legislation regulations polices and workplace procedures

Demonstrate performance across a representative range of contexts from the prescribed items below Complete Groups A and B Complete of the following Group C D Complete of the following Group E F G H Complete Groups I J K

Range of toolsequipmentproceduresworkplace

Group No

The minimum number of items on which skill is to be demonstrated

Item List

A

All

Interpret technical drawings and symbols

Ensure emergency response procedures in place

Communicate with other authorities and stakeholders

Communicate schedulescoordinate to persons

Carry out job safety analysis

Obtain work permit

Use and interpret Dial Before You Dig report or its equivalent

B

At least

Excavation

Trenching

Shoring

Stitch bore

Horizontal drilling

Directional drilling

C

At least

Connection of nylon to other materials

Nylon polymide pipeline laying techniques

Nylon gluing

Nylon stop off

D

At least

PE pipeline laying techniques

Large diameter PE

PE electro fusion

PE butt fusion

Socket fusion

PE stop off

Compression couplings or flanges

Connection of PE to other materials

Practical application of AS Installation and maintenance of plastic pipe systems

E

At least

UPVC pipeline laying techniques

UPVC solvent cemented joints

UPVC moulded joints

UPVC stop off

UPVC couplings or flanges

Connection of UPVC to other materials

Practical application of AS Installation and maintenance of plastic pipe systems

F

At least

Steel pipeline coating repair

Steel pipeline coating testing

Steel field joint coating

G

At least

Connection of steel to other materials

Sleeve application

Clamp application

Hot tap and stopple

H

All

Connection of copper to other materials

Silver brazing

Copper bending

I

All

Isolate vent and purge gas pipeline systems

Working knowledge of ASrelevant confined spaces code of practice

Operation of gas detector

Operate service locator

Where relevant calculate nitrogen volume needed

J

At least

High pressure stop off

Bagtube

Squash off jackspliers

K

At least one occasion

Deal with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items

Context of and specific resources for assessment

This unit should be assessed as it relates to normal work practice using procedures information and resources typical of a workplace This should include

OHS policy and work procedures and instructions

Suitable work environment facilities equipment and materials to undertake actual work as prescribed by this Competency Standard Unit

Appropriate environmental regulation and work practices

Appropriate organisational requirements

Appropriate work environment equipment and tools

In addition to the resources listed above in Context of and specific resources for assessment evidence should show demonstrated competency in commissioning and decommissioning gas distribution pipelines

Assessment of this competency must also be undertaken in either an actual workplace or under a simulated work environment Assessment must also integrate the employability skills

Method of assessment

This Competency Standard Unit shall be assessed by methods given in Volume Part Assessment Guidelines

Note Competent performance with inherent safe working practices is expected in the Industry to which this Competency Standard Unit applies This requires that the specified Essential Knowledge and Associated Skills are assessed in a structured environment which is primarily intended for learningassessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit

Concurrent assessment and relationship with other units

There are no recommended concurrent assessments with this unit however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied Competency Standard Units where listed

UEGNSGB

UEGNSG102B

Carry out work activities in a utilities industry work environment

UEENEEEA

UEENEEE101A

Apply Occupational Health and Safety regulations codes and practices in the workplace

UEGNSGB

UEGNSG104B

Comply with environmental policies and procedures

UEGNSGB

UEGNSG105B

Establish the work site

BSBFLMB

BSBFLM312B

Contribute to team effectiveness

BSBFLMC

BSBFLM303C

Contribute to effective workplace relationships


Range Statement

10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

This Competency Standard Unit shall be demonstrated in relation to commissioning/decommissioning distribution pipelines.

The following constants and variables included in the Element/Performance Criteria in this unit are fully described in the Definitions Section of this volume and form an integral part of the Range Statement of this unit:

Appropriate persons (3)

Tools, Materials and Equipment (3)

Appropriate authorities (3)

Pipeline systems (3)

Documentation (3)

Tools, materials and equipment