Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for thecoordination of gas distribution pipeline repairs and modifications
  2. Plans, specifications and other relevant information and workplace procedures for the work are obtained for all work sites and communicated to all relevant person/s in accordance with workplace procedures
  3. Work health and safety (WHS)/occupational health and safety (OHS) and environmental workplace policies and procedures related to the work are obtained and applied
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks are assessed and control measures implemented in accordance with workplace procedures
  6. Relevant work permit/s are obtained to access, isolate/de-isolate systems and perform work in accordance with job requirements and workplace procedures
  7. Equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures
  8. Relevant persons at work site are confirmed to be current in first aid and other related requirements in accordance with work procedures
  9. Communication issues with relevant stakeholders are resolved and work coordinated in accordance with work schedule and workplace procedures
  10. Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures
  11. Person/s participating in the work are briefed and responsibilities coordinated and confirmed in accordance with job requirements and workplace procedures
  12. Road signs, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plan
  13. Coordinate and conductgaspipeline repair or modification
  14. Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures
  15. Gas distribution pipeline repair and modifications are coordinated to ensure completion in agreed timeframe and to required industry standards with a minimum of waste in accordance with job requirements and workplace procedures
  16. Coordination of gas distribution pipeline repair and modifications are carried out in accordance with the work schedule and workplace procedures
  17. Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised persons for directions in accordance with workplace procedures
  18. Pipeline repair/modification work is conducted and monitored and unplanned events, amendments and modifications in the pipeline repair are undertaken in accordance with workplace procedures
  19. Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  20. Pipeline is inspected and tested and quality and safety checks of work undertaken in accordance with industry standards and workplace procedures
  21. Recommissiongasdistribution pipeline to operational conditionsand complete relevant documentation
  22. Accidents and injuries are reported as required in accordance with workplace procedures
  23. Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  24. Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures
  25. Relevant work permit/s are signed off and pipeline is returned to service in accordance with job requirements and workplace procedures
  26. Records and drawings are updated to reflect repair, modifications and work completion records and reports as installed and relevant documentation completed, processed and appropriate person/s notified in accordance with workplace procedures