Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare to construct copper and stainless steel gas distribution pipelines
- Hazards are identified, WHS/OHS risks assessed and control measures are prioritised, implemented and monitored according to established procedures
- Construct copper and stainless steel gas distribution pipelines
- WHS/OHS risk control measures, schedule of work and standard operating procedures for carrying out the work are followed.
- Appropriate materials, tools, equipment and measuring devices are selected and used correctly and safely.
- Hazardous activities such as lifting, climbing, working in confined spaces, excavations, trenches, or aloft, and use of power tools, techniques and practices are conducted safely in accordance with given instructions and to requirements.
- Construction of copper and stainless steel gas pipelines and services are conducted according to appropriate standards and procedures
- Work is carried out efficiently, to the required standard without waste of materials or damage to apparatus, equipment, the surrounding environment or services and using sustainable energy principles.
- WHS/OHS risks and incidents are reported to the immediate authorised persons for directions according to established procedures
- Procedures for referring non-routine events to the immediate authorised persons for directions are followed.
-
- Routine quality checks are carried out in accordance with work instructions including testing of pipework.
- Complete the work and relevant documentation
Required Skills
Evidence Required
Range Statement