Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare to assist construct and lay a gas distribution mains
- Scope of work and responsibility under the relevant work permit and/or relevant notification is received and confirmed with supervisor according to requirements and established procedures
- Assist in the construction and laying of gas distribution mains
- WHS/OHS risk control measures, schedule of work and standard operating procedures for carrying out the work are followed
- Appropriate materials, tools, equipment and measuring devices are selected and used correctly and safely.
- Hazardous activities such as lifting, climbing, working, excavations, trenches and use of power tools, techniques and practices are conducted safely in accordance with given instructions and to requirements.
- Assistance in preparing the excavation for laying of pipe is provided according to appropriate standards and procedures
- Assistance in constructing and laying of gas distribution mains is provided according to appropriate standards and procedures
- Work is carried out efficiently, to the required standard without waste of materials or damage to apparatus, equipment, the surrounding environment or services and using sustainable energy principles.
- WHS/OHS risks, incidents, accidents and non-routine events are reported to the supervisor according to established procedures
- Routine quality checks are carried out in accordance with work instructions
- Complete the work and relevant documentation
Required Skills
Evidence Required
Range Statement