Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Plan to prepare simple drawings of as laid gas mains and services
- Types of drawings required and key features, symbols and abbreviations for each type of plan and drawing used in the gas industry are identified in accordance with the scope and standard of work being undertaken
- Drawing requirements and needs are determined from work instructions and confirmed with relevant person/s in accordance with workplace procedures
- Client issues in relation to the drawing requirements are clarified and resolved in accordance with workplace procedures
- Equipment, tools and apparatus for producing drawings are identified, obtained and checked for correct operation prior to commencing work
- Prepare drawings of as laid gas mains and services
- Starting point and cross reference points are established and measurements from the starting point, distances and off sets taken and recorded in accordance with job requirements and workplace procedures
- As laid pipework is drawn to scale on graph paper using industry standard drawing conventions in accordance with relevant codes and technical industry standards
- Fittings that effect the off-set or depth of the pipework, including elbows and tees, are indicated on the drawing as required
- Additional fittings that need to be recorded in line with drawing specifications, including in-line valves and tapping tees, are indicated on the drawing, as required
- All dimensions, including off-sets, distances, directions, pipe diameter, symbols and abbreviations are included on the drawing in accordance with job specifications and workplace procedures
- Standard drawing conventions are used to correct original job drawing to show final as laid arrangement in accordance with workplace procedures
- Quality and safety checks of work and testing of pipework is conducted in accordance with industry standards, work instructions and workplace procedures
- Complete work and relevant documentation
- Drawings are finalised and signed off/closed in accordance with workplace procedures
- Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures
- Appropriate person/s are notified of work completion in accordance with workplace procedures
- All drawings and forms are completed and submitted to appropriate person/s in accordance with workplace procedures
Range Statement