Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to establish right of way access for transmission pipeline construction
  2. Topographical/geographical maps and workplace procedures for the site are obtained and job requirements discussed with relevant person/s to confirm the work schedule
  3. WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied in accordance with workplace procedures
  4. Recommendations to assist with construction of right of way for easements are made to others involved in the work in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
  6. Scope of work and level of responsibility under the relevant work permit and/or relevant authorisation is obtained and confirmed with relevant person/s in accordance with job requirements and workplace procedures
  7. Tools, equipment and personal protective equipment (PPE) required for the work are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures and manufacturer instructions
  8. Materials, plans, diagrams, drawings and resources required for the work are confirmed, scheduled and obtained in accordance with workplace procedures
  9. Responsibilities for first aid, emergencies and other work safety procedures for an incident at the work site are checked and confirmed with relevant person/s
  10. Third-party issues are referred to relevant person/s in accordance with workplace procedures
  11. Site preparation, safety plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures
  12. Establish right of way access for transmission pipeline construction
  13. Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures
  14. Hazardous activities, including lifting, climbing, use of power tools, and working in confined spaces, excavations, trenches, or aloft, are conducted safely in accordance with WHS/OHS workplace procedures and job instructions
  15. Work area is cordoned off and made safe for the construction of pipeline easements in accordance with workplace procedures
  16. Construction of pipeline easement is conducted in agreed timeframe and to required standards, without waste of materials or damage to apparatus, circuits, and the surrounding environment or services using sustainable energy principles
  17. WHS/OHS risks and incidents are reported to the authorised person/s for directions in accordance with workplace procedures
  18. Unplanned events are referred to relevant person/s for directions in accordance with workplace procedures
  19. Remedial action associated with the access for pipeline construction is dealt with in accordance with industry standards and workplace procedures
  20. Quality and safety checks of the work are undertaken in accordance with job instructions, industry standards and workplace procedures
  21. Complete work activities and relevant documentation
  22. Work site is rehabilitated, cleaned up and made safe in accordance workplace procedures
  23. Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures
  24. Relevant person/s are notified of work completion in accordance with workplace procedures
  25. Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures