Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan to commission/decommission gas transmission pipelines
  2. Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the sites are identified, obtained and applied
  3. Job requirements and workplace procedures are obtained for all work sites and communicated to relevant person/s in accordance with workplace procedures
  4. WHS/OHS, environmental and sustainable energy policies and procedures are obtained, communicated and applied in accordance with workplace procedures
  5. Work is prioritised and sequenced by management for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures
  6. Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
  7. Relevant work permit/s are obtained to access, isolate/de-energise systems and perform work in accordance with regulatory requirements and workplace procedures
  8. Scope of work and level of responsibility under the relevant work permit/authorisation is confirmed with relevant person/s in accordance with job requirements and workplace procedures
  9. Person/s, equipment, tools, materials, plans, specifications and personal protective equipment (PPE) required for the work are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures
  10. First aid officer at the work site is confirmed with relevant person/s in accordance with job requirements and workplace procedures
  11. Communication issues with relevant stakeholders are resolved and work coordinated by management in accordance with work schedule and workplace procedures
  12. Pipeline is cleaned, pigged, bypassed and checked for commissioning/decommissioning readiness in accordance with workplace procedures
  13. Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures
  14. Person/s participating in the work are briefed and responsibilities confirmed in accordance with job requirements and workplace procedures
  15. Road signs, barriers and warning devices are positioned in accordance with job requirements and traffic management plan
  16. Commission/decommission gas transmission pipelines
  17. Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures
  18. Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures, job instructions and regulatory requirements
  19. Commissioning/decommissioning gas transmission pipelines is performed in agreed timeframe and to industry standards with a minimum of waste or damage to apparatus, circuits, and the surrounding environment or services using sustainable energy principles
  20. Commissioning/decommissioning gas transmission pipelines is performed in accordance with work schedule, job requirements and workplace procedures
  21. Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and incidents reported to authorised person/s for directions in accordance with workplace procedures
  22. Adjustments are made for unplanned events when commissioning/decommissioning gas transmission pipelines in accordance with workplace procedures
  23. Unplanned events and non-routine problems are referred to authorised person/s for directions in accordance with workplace procedures
  24. Relevant reports and quality and safety checks of the work are conducted in accordance with job requirements and workplace procedures
  25. Complete work and relevant documentation
  26. Testing is conducted using relevant tools/equipment and work checked for conformance with job requirements and anomalies reported in accordance with workplace procedures
  27. Accidents and injuries are reported in accordance with requirements and workplace procedures
  28. Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  29. Tools, equipment and any surplus resources and materials are cleaned, checked and stored securely in accordance with workplace procedures
  30. Relevant work permit/s are signed off and equipment returned to service in accordance with workplace procedures, job and regulatory requirements
  31. Final inspections are undertaken and work completion documentation is finalised, processed and provided to appropriate person/s in accordance with workplace procedures

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

commissioning or decommissioning gas transmission pipelines must include at least two (2) of the following procedures:

steel pipeline coating repair

steel pipeline coating testing

steel field joint coating

commissioning or decommissioning gas transmission pipelines must include at least two (2) of the following procedures:

city gate operation (pressure regulator knowledge)

line valve operation

pressure control procedure