Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare and plan to commission/decommission gas transmission pipelines
- Work schedule(s), including drawings, plans, requirements, established procedures and material lists are received, analysed and confirmed if necessary by site inspection
- WHS/OHS and environmental measures for the sites are identified, obtained and understood.
- Relevant requirements and established procedures for the work are communicated to all persons and identified for all work sites
- WHS/OHS, environmental and sustainable energy policies and procedures are obtained and confirmed and communicated
- Work is prioritised and sequenced by management following consultation with others for completion within acceptable timeframes and in accordance with established procedures
- Hazards are identified, WHS/OHS risks are assessed and control measures are prioritised, implemented and monitored against the work schedule and established procedures.
- Relevant work permits are obtained to access, isolate/de-energise systems and perform work according to requirements and established procedures
- Scope of responsibility under the relevant work permit/authorization is received and confirmed with relevant persons according to requirements and established procedures
- Resources including persons, equipment, tools, materials, plans, specifications and personal protective equipment required to carry out the work are identified, scheduled and obtained and checked for operation and safety
- Relevant persons at worksite are confirmed to be current in First Aid and other related work procedures according to requirements
- Liaison and communication issues with authorised persons, authorities, clients and land owners are resolved and activities coordinated to carry out work by management
- Pipeline in check for readiness (cleaned, pigged, bypassed, etc.) for commissioning/ decommissioning
- Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures
- Persons participating in the work, including plant operators and contractors are fully briefed and respective responsibilities confirmed in accordance with established procedures
- Road signs, barriers and warning devices are positioned in accordance with requirements including traffic management plans
- Commission/decommission gas transmission pipelines
- WHS risk control measures, schedule of work and standard operating procedures for carrying out the work are followed
- Appropriate materials, tools, equipment and measuring devices are selected and used correctly and safely.
- Hazardous activities such as lifting, climbing, working in confined spaces, excavations, trenches, or aloft, and use of power tools, techniques and practices are conducted safely accordance with given instructions and requirements
- Commissioning/ decommissioning of gas transmission pipelines is carried out efficiently in an agreed timeframe and to required standards with a minimum of waste of materials or damage to apparatus, circuits, the surrounding environment or services and using sustainable energy principles
- Commissioning/decommissioning of gas transmission pipelines is carried out in accordance with the work schedule and to requirements/established procedures
- Hazard warnings and safety signs are recognised and hazards are assessed and WHS/OHS risks and incidents are reported to the immediate authorised persons for directions according to established procedures
- Adjustments are made for unplanned events in commissioning/decommissioning of gas transmission pipelines are undertaken within the scope of established procedures
- Procedures for referring non-routine events to the immediate authorised persons for directions are followed
- Reports and ongoing checks of quality of the work are undertaken in accordance with given instructions and established procedures
- Complete work and relevant documentation
- Tools and equipment appropriate to the testing requirements are selected and work undertaken is checked against works schedule for conformance with requirements, anomalies are reported in accordance with established procedures
Required Skills
Evidence Required
Range Statement