Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare and plan for pigging gas transmission pipelines
  2. Work schedule, drawings, plans, job requirements and workplace procedures for the work are obtained and communicated to relevant person/s in accordance with workplace procedures
  3. WHS/OHS, environmental and sustainable energy policies and procedures are obtained, applied and communicated to relevant person/s
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with others in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
  6. Responsibilities under the relevant work permit/notification are obtained and confirmed with relevant person/s to access, isolate/de-energise systems and perform the work in accordance with regulatory requirements and workplace procedures
  7. Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures
  8. Responsibilities for first aid and other emergency incidents at the work site are checked and confirmed with relevant person/s in accordance with workplace procedures
  9. Communication issues with relevant stakeholders are resolved and work coordinated in accordance with work schedule and workplace procedures
  10. Site preparation, safety plan and work schedule are confirmed in accordance with workplace procedures
  11. Site, PIG, PIG trap, station and pipeline are prepared to minimise risk and damage to property, commerce and individuals in accordance with workplace procedures
  12. Person/s participating in the work, including plant operators and contractors, are briefed and responsibilities confirmed in accordance with workplace procedures
  13. Signage, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plan
  14. Launch and recover gastransmission pipeline PIGs
  15. Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions
  16. Hazardous activities are performed safely in accordance with workplace procedures, codes and regulatory requirements
  17. Gas transmission pipeline PIG is launched, tracked and recovered in accordance with work schedule and workplace procedures
  18. Work is carried out to industry standards without waste of materials or damage to apparatus, circuits, and the surrounding environment or services using sustainable energy principles
  19. Hazards and WHS/OHS risks are assessed and incidents reported to the authorised person/s for directions in accordance with workplace procedures
  20. Data/results from transmission pipeline pigging operations is gathered/retrieved and analysed to determine internal pipeline conditions in accordance with workplace procedures
  21. Testing and inspecting of the pipeline and pigging equipment is conducted in accordance with job requirements and workplace procedures
  22. Unplanned events and non-routine problems are referred to authorised person/s for direction in accordance with workplace procedures
  23. Fault-finding and troubleshooting techniques are applied to problems encountered with the PIG launch and recovery in accordance with requirements and workplace procedures
  24. Quality and safety checks of the work are undertaken in accordance with industry standards and workplace procedures
  25. Re-establish transmission pipeline to operational condition, complete work and relevant documentation
  26. Retrieved PIG is inspected to determine the wear sustained to the PIG material and anomalies reported in accordance with workplace procedures
  27. Accidents and injuries are reported in accordance with requirements and workplace procedures
  28. Waste materials are safely disposed of and work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures
  29. Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures
  30. Appropriate person/s are notified of work completion in accordance with workplace procedures
  31. Relevant work permit/s are signed off and pipeline returned to service in accordance with regulatory requirements and workplace procedures
  32. Data is recorded and work completion records, reports, as modified drawings and documentation are completed, processed and appropriate person/s notified in accordance with workplace procedures