Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan to organise repairs in LPG processing/storage facilities and equipment
  2. Job requirements and workplace procedures for the work are obtained for all work sites and communicated to relevant person/s
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and sustainable energy policies and procedures for repairing faults in LPG processing/storage facilities and equipment are obtained and communicated to relevant person/s
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with others in accordance with workplace procedures
  5. Hazards and WHS/OHS risk are identified and prioritised and control measures implemented and monitored
  6. Relevant work permits are obtained to access, isolate/de-energise systems and perform work in accordance with regulatory requirements and workplace procedures
  7. Appropriately licensed person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and checked for correct operation in accordance with workplace procedures
  8. Communication issues with authorised persons, authorities, clients and land owners are resolved and work coordinated in accordance with work schedule and workplace procedures
  9. Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with work schedule and workplace procedures
  10. Person/s participating in the work, including plant operators and contractors, are briefed and responsibilities coordinated in accordance with workplace procedures
  11. Organise and monitor repair of faults in LPG processing/storage facilities and equipment
  12. Hazardous activities are performed safely and currency maintained as required in accordance with regulatory requirements and workplace procedures
  13. Fault repairs are organised to ensure completion in agreed timeframes and to quality/safety/environmental standards in accordance with job requirements and workplace procedures
  14. Repair work and replacement of faulty work equipment is conducted in accordance with permit to work requirements and monitored to ensure activities are carried out with minimal impact on existing operations and environment
  15. Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised person/s for directions in accordance with workplace procedures
  16. Unplanned events encountered when organising fault repairs are identified and actioned in accordance with workplace procedures
  17. Quality and safety checks of the repairs are undertaken in accordance with workplace procedures
  18. Complete work and relevant documentation
  19. Accidents and injuries are reported in accordance with workplace procedures
  20. Work site is rehabilitated, cleaned up and made safe in accordance with job instructions and workplace procedures
  21. Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures
  22. Relevant work permit/s are signed off and equipment/facility is returned to service in accordance with job requirements and workplace procedures
  23. Repaired/installed equipment is brought back on line in accordance with workplace procedures
  24. Work completion records, reports and as installed/modified drawings and documentation are completed, processed and appropriate person/s notified in accordance with workplace procedures

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

operation of equipment must include at least seven (7) of the following:

gas detectors

purging gas

hand tools

LPG hoses

flare

valves

compressors

vessels

pumps

road tankers

control and instrumentation equipment faults must include at least seven (7) of the following:

gas leak

electrical problems

over filled vessel

compressor failure

pump failure

out-of-current inspection status

gauge failure

hose rupture/leaks

instruments out of calibration

non-flow of LPG

cylinder scales out of calibration

meter out of calibration