Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Plan and prepare for the work
- Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure
- Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications
- Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan
- Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications
- Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plant security and capacity in accordance with system/site requirements
- Coordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
- Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures
- Work area is prepared in accordance with work requirements and site procedures
- Where appropriate, the teams and individuals roles and responsibilities within the team are identified, and where required, assist in the provision of on-the-job training
- Fabricate and install pipe work
- Maintain industrial pipework
- Complete the work
Required Skills
Evidence Required
Range Statement
|
10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.Pipe work may be fabricated from material including, ABS, PVC, polyurethane, copper, stainless steel, galvanised steel, black steel, copper/nickel, concrete and mineral fibre.Tools and equipment may include stocks, dyes, threading machine, hydraulic benders, hand benders, hand and power cutters, welders, plastic heat gun, spirit level, grinders, jigs and lifting devices.Fittings/components may include couplings, screw fittings and flanges.Pipes may contain or have contained water, gas, air or chemicals of a hazardous nature.Pipe work may be protected by protective coatings.Details of maintenance may be clarified by diagnosis and work place inspection.Work completion details may include plant and maintenance records, job cards, check sheets, on device labelling updates and reporting and/or documenting equipment defects.Work site environment may be affected by nearby plant or processes, e.g. chemical, heat, dust, noise, gas and oil.Isolations can refer to electrical/mechanical or other associated processes.Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1.00 Preliminary Information and Glossaries. |