Elements and Performance Criteria
- Plan and prepare for the work
- Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers' specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure
- Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications
- Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan
- Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications
- Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plant security and capacity in accordance with system/site requirements
- Coordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work.
- Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures
- Work area is prepared in accordance with work requirements and site procedures
- Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of on-the-job training
- Remove transmissions / plant for maintenance
- Required isolations are confirmed where appropriate in accordance with site requirements
- Transmission/plant is disconnected in accordance with the work plan
- Transmission/plant is removed in a manner which will assist in replacement in accordance with the work plan
- Transmission/plant is inspected for abnormalities in accordance with the work plan
- Maintain industrial transmission
- Maintenance is performed in accordance with manufacturers specifications and site procedures
- Mechanical drive/transmission assembly is dismantled using appropriate engineering principles and technical procedures in accordance with the job plan and site requirements
- Component parts are clearly marked, and sketches produced as required, for identification in accordance with the job plan and site requirements
- Component wear and clearances are determined using precise measuring techniques and appropriate test equipment in accordance with manufacturer specifications and site requirements
- Components found to be faulty are repaired, replaced and/or adjusted to conform with manufacturer specifications and site requirements
- New components are inspected for compliance to required specifications and prepared for re-assembly in accordance with manufacturer specifications/site requirements
- Component parts are refitted to mechanical drive/transmission assembly in accordance with manufacturer specifications/site requirements
- Modifications/alterations are undertaken in accordance with site requirements
- Replace/install transmission
- Site is prepared for transmission replacement in accordance with the work plan
- Transmission is replaced in accordance with the work plan and manufacturer specifications
- Transmission is levelled, aligned, coupled and connected in accordance with the work plan.
- All fastenings are torqued in accordance with manufacturer specifications and site requirements
- Machinery/plant and transmission are test run, monitored and adjusted as required in accordance with manufacturer specifications and site requirements
- Complete the work
- Work is completed and appropriate personnel notified in accordance with site/enterprise requirements
- Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures
- Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures
- Work completion details are finalised in accordance with site/enterprise procedures