Elements and Performance Criteria
- Plan and prepare for the work
- Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers' specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure
- Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications
- Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan
- Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications
- Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plant security and capacity in accordance with system/site requirements
- Coordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
- Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures
- Work area is prepared in accordance with work requirements and site procedures
- Where appropriate the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
- Remove associated equipment
- Required notations are confirmed where appropriate in accordance with site requirements
- Associated equipment is disconnected in accordance with the work plan
- Associated equipment is removed in a manner that will assist in replacement in accordance with the work plan
- Associated equipment is inspected for abnormalities in accordance with the work plan
- Perform generator maintenance
- Maintenance is performed in accordance with manufacturer specifications and the work plan
- Generator is dismantled, clearly marked for identification and relevant data/sketches noted/drawn in accordance with the work plan
- Components are correlated in preparation for re-assembly in accordance with manufacturer drawings/manuals
- New components are inspected to ensure compliance with manufacturer specifications
- Dimensional inspection is performed on generator and components to ensure compliance with manufacturer specifications.
- Components are reassembled for any testing required in accordance with manufacturer specifications and the work plan
- Components are levelled, aligned and coupled in accordance with manufacturer specifications and the work plan
- Replace generator associated equipment
- Associated equipment is replaced and connected in accordance with the work plan
- Generator is rotated and checks carried out to ensure operating conditions are in accordance with manufacturer specifications
- Out of specification modifications/alterations are approved by appropriate authority and recorded and documented in accordance with site/enterprise requirements
- Final job inspection is completed and any permits relinquished in accordance with the work plan
- Complete the work
- Work is completed and appropriate personnel notified in accordance with site/enterprise requirements
- Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures
- Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures
- Work completion details are finalised in accordance with site/enterprise procedures