Elements and Performance Criteria
- Plan and prepare for the work
- Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers' specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure
- Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications
- Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan
- Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications
- Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plant security and capacity in accordance with system/site requirements
- Coordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
- Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures
- Work area is prepared in accordance with work requirements and site procedures
- Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
- Inspect and dismantle equipment/components
- Equipment/components are dismantled and marked in a manner that will facilitate reassembly
- Equipment/components are dismantled where required using appropriate engineering principles
- Damaged or faulty equipment/components are assessed against operational and/or manufacturer specifications
- Faulty equipment/components identified for repair, replacement or manufacture
- Repair/replace faulty equipment/components
- Manufacture parts or components
- Parts/components specifications are determined using appropriate engineering methods
- Appropriate materials are selected in accordance with the work requirements
- Parts/components are manufactured/ fabricated using appropriate engineering methods
- Completed work is inspected to ensure compliance with the work requirements and specifications
- Reassemble equipment/components
- Complete the work
- Work is completed and appropriate personnel notified in accordance with site/enterprise requirements
- Work area is cleared of waste, cleaned, restored and secured in accordance with site/enterprise procedures
- Plant, tools and equipment are maintained and stored in accordance with site/enterprise procedures
- Work completion details are finalised in accordance with site/enterprise procedures