Elements and Performance Criteria
- Plan and prepare for the work
- Maintenance and operating history is obtained
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications and enterprise procedures are identified, applied and monitored throughout the inspection procedure
- The inspection is planned in detail including sequencing, prioritising and considerations are made where appropriate of relevant technical and engineering procedures.
- Resources required to satisfy the plan are identified, obtained and inspected for compliance with the job specifications
- Relevant plans, drawings and texts are selected and interpreted in accordance with the plan
- Co-ordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
- Potential hazards are identified and prevention and/or control measures are selected in accordance with the inspection plan and site procedures
- Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
- Carry out generator inspection
- Required isolations are confirmed where appropriate in accordance with site requirements
- Generator is inspected using appropriate manuals, drawings and texts in accordance with the plan
- Generator is inspected in conjunction with others involved in, or affected by, the inspection plan
- Any needs for additional tests/inspections required are defined
- Inspection is carried out and permits relinquished in accordance with the plan
- Evaluate/analyse inspection results
- Prepare remedial action plan
- Update documentation