Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare for inspection process plant
- Short term maintenance and operating history is obtained
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications and enterprise procedures are identified, applied and monitored throughout the inspection procedure
- Deviations from normal operational parameters are identified
- Potential options for cause of deviations are established
- Needs and outcomes for plant inspections and/or test are defined, in accordance with potential options
- Appropriate method sheets, check sheets and isolation instructions are obtained
- Relevant technical and engineering procedures are considered and adapted where required
- Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
- Inspection process plant
- Evaluate/analyse inspection results
- Prepare remedial action plan
- Update documentation
Required Skills
Evidence Required
Range Statement
|
10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.Generation plant and/or equipment may include fired and unfired pressure vessels, pipe work valves and fittings, turbines, generators, chemical and water treatment plant, ashing plant, gas turbine plant, hydro plant, wind farm plant, fuel firing plant, draught plant and pumping equipment.Safety standards may include relevant sections of Occupational Health and Safety legislation, enterprise safety rules and procedures, relevant state and federal legislation, national standards or codes of practises for plant.Information and documentation sources may include verbal or written communications; enterprise safety rules documentation/form(s); equipment and alarm manuals; dedicated computer equipment; drawings, logic diagrams; testing procedures; plant records; plant failure reports; enterprise/site standing and operating instructions; enterprise/site log books; manufacturer’s operation and maintenance manuals; and specialist’s reports.Technical and operational indicators may include stimuli (audio, smell, touch, visual), remote or local indicators and recorders, alarms (visible and or audible) and basic fault finding equipment.Tests may include stand-by plant tests, pre-commissioning operating tests, functional testing and sampling.Appropriate personnel for consultation may include supervisor/team leader or equivalent, technical and engineering officers or equivalent, power system control personnel or equivalent, maintenance staff, power plant operations personnel, contractor and external specialist personnel.Operating environment may be, remote from plant, aided by indicators and monitors, during inclement or otherwise harsh weather conditions, in wet/noisy/dusty/hot areas, during night periods, dependant on duty cycle and working in confined spaces.Faults and abnormal operating conditions may include, pressure, level, flow, temperature, speed, vibration and mix.Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries. |