Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Plan and prepare for performance test
- Safety and process plant issues are identified, in accordance with workplace procedures
- Specialist assistance and personnel are arranged, in accordance with workplace procedures
- Tools and equipment are identified and acquired, in accordance with workplace procedures
- Test equipment is calibrated as specified in industry standards, manufacturers' specifications and workplace procedures
- Performance test requirements are determined and planned, in accordance with manufacturers' specifications and workplace procedures
- Process plant is identified and its' status prior to the test is established, in accordance with workplace procedures and from appropriate personnel
- Authority to carry out work is obtained, in accordance with workplace procedures, process plant operating conditions and load requirements
- Undertakeperformance test and collect data
- Performance tests and data collection are undertaken using appropriate techniques that ensure personnel safety and process plant integrity
- Performance tests are carried out, in accordance with workplace procedures
- Data is collected, in accordance with workplace procedures
- Performance test results are evaluated to accurately assess performance of process plant
- Process plant availability is declared, on completion of tests, in accordance with workplace procedures
- Evaluate and analyse information
- Process plant performance is measured against criteria or specifications, in accordance with workplace procedures
- Cause of abnormal process plant performance is identified by analysing technical and operational information
- Process plant integrity is maintained through consultation with appropriate personnel and reference to technical and operational documentation
- Performance test data is critiqued and validated, referencing technical information and applicable test procedure documentation
- Complete documentation
- Reports and documentation are produced, in accordance with workplace procedures
- Reports and documentation are presented to appropriate personnel, in accordance with workplace procedures, to facilitate implementation of recommendations
Range Statement