Elements and Performance Criteria
- Plan and prepare the work
- Work requirements are identified from request/work orders or equivalent and clarified/confirmed with appropriate parties or by site inspection.
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers' specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedures.
- Resources required to satisfy the work plan are identified, obtained and inspected for compliance with the job specifications.
- Relevant plans, drawings and texts are selected and interpreted in accordance with the work plan.
- Correct size, type and quantity of materials/components are determined, obtained and inspected for compliance with the job specifications.
- Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for the maintenance of plan security and capacity in accordance with system/site requirements.
- Co-ordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work.
- Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures
- Work area is prepared in accordance with work requirements and site procedures.
- Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of on-the-job training.
- Conduct condition monitoring
- Plant and/or equipment co-ordinated to initial operating state prior to tuning in accordance with all relevant standards and the work plan.
- Testing is performed using appropriate methods and techniques, including liaising with relevant personnel, in accordance with the work plan.
- Test results are collected and recorded using appropriate techniques in accordance with the work plan.
- Test results are checked against previous data to assess the performance of the plant/equipment in accordance with the work plan.
- Plant integrity is maintained through consultation with appropriate personnel and reference to relevant technical and operation documentation.
- Equipment monitoring is conducted in accordance with enterprise, OHS and environmental practices and procedures.
- Evaluate and analyse equipment and condition
- Plant/equipment performance is determined from analysis of data/information received.
- Plant/equipment performance is measured against required criteria and any deviations are identified and recorded.
- New settings determined and implemented as required to obtain desired outcomes.
- Causes of abnormal plant performance are identified following analysis of test data.
- Plant integrity is maintained through consultation with appropriate personnel and reference to relevant technical and operational documentation.
- Test data is examined and validated using appropriate techniques in accordance with the work plan.
- Complete documentation