Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Plan and Prepare for the Work
- Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturer specifications, environmental requirements and enterprise procedures are identified, applied and monitored throughout the work procedure.
- Work requirements are identified from request/works orders or equivalent and clarified/confirmed with appropriate parties or by site inspection.
- Resources required to satisfy the work are identified, obtained and inspected for compliance in accordance with enterprise procedures.
- Potential hazards are identified and prevention and/or control measures are selected in accordance with the work plan and site procedures.
- Work is planned in detail including sequencing and prioritising and considerations made, where appropriate, for maintenance of plant security and capacity in accordance with system/site requirements
- Co-ordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
- Monitor Civil assets
- Maintain Civil assets
- Complete the work
Required Skills
Evidence Required
Range Statement
|
10) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.Civil assets may include dams, canals/flumes, tail race, intake structures, outlet structures, regulating structures, pen stocks, pipelines, syphons, rising mains, tunnels, pumping stations, access roads, fencing, other relevant buildings.Safety standards may include relevant sections of Occupational Health and Safety legislation, enterprise safety rules, relevant state and federal legislation, local by-laws, environmental requirements, relevant licensing requirements for tools and mobile plant.Communications may be by means of telephone, fax, two-way radio, dedicated computer equipment, logs, verbal.Appropriate personnel to consult, give or receive direction may include power plant operator/system controllers or equivalent, technical and engineering officers or equivalent, maintenance staff, other authorities, contractors, general public.Tools and equipment may include lifting equipment, cranes, hoists, mobile plant, four wheel drive vehicles, earth moving equipment, trash rakes, power tools, chainsaws, boats, hand tools, fire suppression equipment.Extreme and varied weather conditions may be encountered, including snow, freezing rain, high winds and flooding.Work completion details may include enterprise recording procedures (electronic or hard copy).Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries. |