Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
Required Skills
Evidence Required
Range Statement
|
10) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.Equipment may include Links (single and three phase), RMU (vacuum, oil, gas, air), Fuses (EDO, HRC, ) Switches (vacuum, oil, gas, air), Isolators (Air gas vacuum oil), Circuit recloser (oil, gas), earthing and discharge equipment, gloves, testers, computers with equipment control functions; protection settings, alarm and control equipment. (Personal safety equipment). Any LV that directly impacts on HV switching (e.g. LV backfeeds).Safety standards may include relevant sections of occupational health and safety legislation, enterprise safety rules, relevant state and federal legislation and national standards for plantInformation and documentation sources may include verbal or written communications; single line drawing and schematics, enterprise safety rules documentation; enterprise operating instructions; dedicated computer equipment; enterprise/site standing and operating instructions; enterprise log books; manufacturer operation and maintenance manuals; and equipment and alarm manualsTechnical and operational indicators may include stimuli (audio, smell, touch, visual), local indicators and recorders, computers and alarms (visible and or audible)Communications may be by means of telephone, two way radio, pager, computer (electronic mail), operating logs (written or verbal) and intercomAppropriate personnel for consultation, to give or receive direction may include supervisor/team leader or equivalent, power plant operations personnel or equivalent, technical and engineering officers or equivalent, maintenance staff, other operating staff or equivalent, system controller/network controller and field operator and restricted H.V. operatorsImplications may be safety of personnel and public, damage to equipment, loss of plant, legal implications, system integrity, capital cost, lost enterprise revenue and community costs. |