Elements and Performance Criteria
- Plan & prepare work
- Safety issues are identified to comply with enterprise/site requirements.
- Work requirements are identified from relevant personnel and documentation.
- Operational checks are carried out on plant according to manufacturer’s recommendations and site requirements
- Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training.
- Operate plant
- Gas turbine exhaust gas flow and power output are adjusted to achieve required steam flow and conditions, observing operating requirements.
- Supplementary Firing System (if provided) is placed into and out of service as required to maintain design steam flow and steam conditions.
- Monitoring and control of Heat Recovery Steam Generator drum level, feedwater flow, steam temperature, pressure and flow are carried out in accordance with manufacturer’s and site requirements
- Plant is operated within limits of plant design, enterprise or site requirements.
- Corrective action is taken to rectify abnormalities in accordance with manufacturer’s and enterprise/site procedures.
- Monitor Plant
- Plant to be monitored is identified.
- Plant is monitored for normal operation and/or to detect deviations from required operating conditions.
- Plant integrity and personnel safety is maintained through consultation with appropriate personnel, and reference to plant technical and operational documentation
- Appropriate personnel are notified when defects are detected.
- Analyse system faults
- Test plant operation
- Tests are performed in accordance with defined procedures applicable to the operational test
- System and plant are observed for correct operational response
- Plant is returned to required operational status upon completion of test
- Corrective action is taken when response is not in accordance with documentation, plant integrity or personnel safety requirements
- Complete Documentation