Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Elements and Performance Criteria
- Prepare for the inspection, maintenance and restoration of overhead distribution network infrastructure
- Relevant requirements and established procedures for the work are communicated to all personnel and identified for all worksites
- Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures related to requirements and established procedures for the inspection of overhead structures and electrical apparatus used on poles and/or structures, the maintenance of overhead energised LV conductors and cables and LV switching, are obtained and confirmed for the purposes of the work to be performed and communicated
- Physical loads and calculations are confirmed according to requirements using essential knowledge and appropriate skill
- Work is prioritised and sequenced following consultation with others for completion within acceptable timeframes and in accordance with established procedures
- Hazards are identified, WHS/OHS risks assessed and control measures prioritised, implemented and monitored, including emergency exits kept clear according to established procedures
- Relevant work permits are obtained to access and perform work according to requirements and/or established procedures
- Resources, including personnel, equipment, tools and personal protective equipment (PPE), required for the job are obtained and confirmed in working order
- Specialist equipment for live work is inspected and confined in working order in accordance with requirements and established procedures
- Relevant personnel at worksite are confirmed current in first aid, pole top rescue and other related work procedures according to requirements
- Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved to carry out work where necessary
- Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures
- Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities confirmed, where applicable, in accordance with established procedures
- Traffic management plan is identified and implemented
- Carry out inspection, maintenance and restoration of overhead distribution network infrastructure
- Lifting, climbing, working in confined spaces and aloft, and use of power tools/equipment, techniques and practices are safely followed, and currency according to requirements confirmed
- Essential knowledge and associated skills are applied in the safe maintenance and restoration of overhead distribution network infrastructure to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements
- Inspection of overhead structures and electrical apparatus used on poles and/or structures is carried out in accordance with the work schedule and requirements/established procedures
- Maintenance, including repair and/or replacement of poles and/or structures, is carried out in accordance with the work schedule and requirements/established procedures
- Communications with Switching Control Officer are established and maintained throughout the isolation operation according to established procedures
- Electrical equipment and associated circuits line/network or worksite to be switched, including paralleling, is isolated and proved de-energised using appropriate devices and earthed, where required, according to requirements and established procedures
- Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to the immediate authorised persons for directions according to established procedures
- Unplanned events during the inspection, maintenance or switching procedures are undertaken within the scope of established procedures
- Known solutions to a variety of problems are applied using acquired essential knowledge and associated skills
- Ongoing checks of quality of the work are undertaken in accordance with instructions and established procedures
- Complete the inspection, maintenance and restoration of overhead distribution network infrastructure
- Accidents and/or injuries are reported in accordance with requirements/established procedures, where applicable
- Worksite is rehabilitated, cleaned up and made safe in accordance with established procedures
- Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage or disposed of in accordance with established procedures
- Relevant work permits are signed off and overhead structures and electrical apparatus used on poles and/or structures are returned to service in accordance with requirements
- Works completion records, reports, as installed/modified drawing and/or documentation and information are finalised and processed and appropriate personnel notified
Range Statement