Elements and Performance Criteria

  1. Prepare to inspect, test and verify overhead distribution installation
  2. Job requirements and workplace procedures are identified and communicated with relevant personnel
  3. Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for accessing, testing and verifying overhead distribution installations are obtained and confirmed for the purposes of the work to be performed
  4. Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
  5. Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
  6. Relevant work permits are obtained, understood and signed in accordance with workplace procedures
  7. Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
  8. Specialist test and measurement equipment for testing and verification of overhead distribution installations are obtained, inspected and confirmed in working order and calibrated in accordance with requirements and workplace procedures
  9. Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
  10. Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures
  11. Traffic management plan is confirmed as being applied in accordance with workplace procedures
  12. Carry out inspection, testing and verification of overhead distribution installation
  13. Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
  14. Inspection, safe access, testing and verification of overhead distribution installations are completed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures
  15. Overhead distribution installations and associated hardware are visually inspected, positioned, secured and terminated/connected in accordance with workplace procedures
  16. Energised tests and/or measurements to verify overhead distribution installations are determined in accordance with workplace safety procedures and relevant industry standards, as required
  17. Overhead distribution installations are checked for suitability and conformance with workplace procedures and relevant electrical network supply industry standards
  18. Overhead distribution installation protection methods and devices are validated in accordance with workplace procedures and relevant distribution network protection industry standards
  19. Overhead distribution installation switchgear is validated in accordance with workplace procedures and relevant distribution network protection industry standards
  20. Overhead distribution installations earthing systems and multiple earth neutral (MEN) system components are verified as correctly installed and conforming to workplace procedures and relevant distribution network industry standards
  21. Mandatory tests are conducted to verify overhead distribution installation system voltage,phasing, phase rotation, polarity and neutral potentialcomply with relevant industry standards
  22. Solutions used to solve overhead distribution installation problems are applied in accordance with workplace procedures
  23. Quality checks of work are undertaken in accordance with workplace procedures
  24. Report inspection and test findings
  25. Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
  26. WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
  27. Worksite is rehabilitated, cleaned up and made safe and in accordance with workplace procedures
  28. Non-compliance defects are identified, corrected and/or reported in accordance with workplace procedures
  29. Recommendations for rectifying defects are made in accordance with workplace procedures
  30. Mandatory documentation is completed in accordance with workplace procedures and relevant industry standards
  31. Tools, equipment and surplus resources are, where appropriate, cleaned, checked and returned in accordance with workplace procedures
  32. Relevant work permits are signed off and electrical equipment (network infrastructure) are returned to service in accordance with workplace procedures
  33. Work records, reports and/or documentation are completed in accordance with workplace procedures