Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and coordinate for the design of transmission, sub-transmission and zone substation protection and control systems
  2. Carry out and coordinate the design of transmission, sub-transmission and zone substation protection and control systems
  3. Complete and coordinate the design of transmission, sub-transmission and zone substation protection and control systems

Required Skills

Essential Knowledge and Associated Skills EKAS This describes the essential skills and knowledge and their level required for this unit

Evidence shall show that knowledge has been acquired of designing distribution substations

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies

The extent of the essential knowledge and associated skills EKAS required is given in Volume Part EKAS It forms an integral part of this unit

E

Occupational Health and Safety principles

E

Electrical safe working practice

T

Safe design principles

T

Feeder automation system

T

Commissioning of discrete protection devices Substations

T

Substation LV supply design principles

T

Substation control systems design principles

T

Commissioning of distribution protection and control systems substations

T

Voltage regulation scheme principles Substations

T

Use of test equipment on a discrete protection scheme Substations

T

Electrical equipment distribution field device protection and control schemes substations

T

Circuit breaker auxiliary systems

T

Protection scheme requirements

T

Discrete protection systems

T

Interdependent protection systems

T

Complex protection systems

T

Test Equipment A fundamental

T

Test Equipment B protection

T

Test Equipment D control

T

Protection schemes

T

Transmission subtransmission and zone substation control and protection design process principles

Evidence Required

This provides essential advice for assessment of the unit of competency and must be read in conjunction with the Performance Criteria and the range statement of the unit of competency and the Training Package Assessment Guidelines

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and performed in accordance with the Assessment Guidelines of this Training Package

Overview of Assessment

Longitudinal competency development approaches to assessment such as Profiling require data to be reliably gathered in a form that can be consistently interpreted over time This approach is best utilised in Apprenticeship programs and reduces assessment intervention It is the Industrys preferred model for apprenticeships However where summative or final assessment is used it is to include the application of the competency in the normal work environment or at a minimum the application of the competency in a realistically simulated work environment It is recognised that in some circumstances assessment in part or full can occur outside the workplace However it must be in accord with Industry and Regulatory policy in this regard

Methods chosen for a particular assessment will be influenced by various factors These include the extent of the assessment the most effective locations for the assessment activities to take place access to physical resources additional safety measures that may be required and the critical nature of the competencies being assessed

The critical safety nature of working with electricity electrical equipment gas or any other hazardous substancematerial carries risk in deeming a person competent Hence sources of evidence need to be rich in nature so as to minimise error in judgment

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its richness Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package

Critical aspects of evidence required to demonstrate competency in this unit

Before the critical aspects of evidence are considered all prerequisites shall be met

Evidence for competence in this unit is based shall be considered holistically Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the Assessment Guidelines UET Evidence shall also comprise

A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline work function and industrial environment In particular this shall incorporate evidence that shows a candidate is able to

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range and

Apply sustainable energy principles and practices as specified in the Performance Criteria and range and

Demonstrate an understanding of the essential knowledge and associated skills as described in this unit to such an extent that the learners performance outcome is reported in accordance with the preferred approach namely a percentile graded result where required by the regulated environment and

Demonstrate an appropriate level of employability skills and

Conduct work observing the relevant Anti Discrimination legislation regulations policies and workplace procedures and

Demonstrated performance across a representative range of contexts from the prescribed items below

Range of toolsequipmentmaterialsproceduresworkplacesother variables

Group No

The minimum number of items on which skill is to be demonstrated

Item List

A

Completion of two compliant technical designs relating to each of the following

Protection and control systems implemented to suit statutory and organisational requirements

AC and DC circuit diagrams correct and documented

SCADA hardwired and serially communicated signals

Metering

Load control

Power factor control

AC and DC supplies

Protection and control panel layouts

Control cable termination diagrams

B

Designs should also included all the following

Activities that address the correction of errors in the process

Application of a design control checklist which lists all of the required design activities to be carried out in this process

C

At least one occasion

Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items

Context of and specific resources for assessment

This unit should be assessed as it relates to normal work practice using procedures information and resources typical of a workplace This should include

OHS policy and work procedures and instructions

Suitable work environment facilities equipment and materials to undertake actual design of transmission subtransmission and zone substation protection and control systems

In addition to the resources listed above in Context of and specific resources for assessment evidence should show demonstrated competency working realistic environment and a variety of conditions

Method of assessment

This Competency Standard Unit shall be assessed by methods given in Volume Part Assessment Guidelines

NoteCompetent performance with inherent safe working practices is expected in the Industry to which this Competency Standard Unit applies This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learningassessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit

Note:
Competent performance with inherent safe working practices is expected in the Industry to which this Competency Standard Unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.

Concurrent assessment and relationship with other units

There are no recommended concurrent assessments with this unit however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed


Range Statement

8) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

This Competency Standard Unit shall/may be demonstrated in relation to the design of transmission, sub-transmission and zone substation protection and control components and may include the following equipment:

Manufacturers recommendations; Reliability performance profiles; Knowledge of local history and experience; Consultation with other Authorities; Environmental influences; Present practices.

Equipment includes; Sectionalisers, air break switches, capacitor banks, transformer taps, metering and protection equipment, data communication systems

Primary and secondary voltage and current injection equipment; time delay measuring equipment; Current transformers; Voltage transformers; Power transformers; Tapchangers; Circuit breakers; Capacitor banks; Ring main units; Audio frequency load control; Circuit breaker auxiliary systems; Substation and metal structure earthing systems; SCADA interfaces and transducer inputs; local opto-isolated alarms: PLC programs; Auto Reclosers (ACRs); protection relays; metering; control circuits; Statistical metering systems; Frame leakage relays; Distance relays; Pilot wire relays; Transformer differential relays; Busbar differential relays; Impedance bus zone relays; Overcurrent and earth fault relays; Transformer neutral check relays; Circuit breaker fail relays; Multi-trip relays; Auto recloser relays; Voltage transformer failure relays; Surge protection relays; Buchholz relays; Winding temperature relays; Sensitive earth fault relays; Phase failure relays; Frequency relays; Load shedding relays; General protection LV devices; Oil temperature protection devices; Oil surge protection devices; Power supplies. differential relays; power systems; multi-facetted schemes; interactive overload schemes, distance protection (incorporating relay selection, switched/non-switched schemes; mutual coupling and teed feeder systems); protection signalling (incorporating series, direct, permissive, distance acceleration, block interruption); telecommunication circuits and equipment.

AC protection circuits: HV FDRs, TFRs, BBP/LBU, LV FDRs

DC protection and control circuits: Supplies and auxiliaries, protection, BBP, trip circuit monitoring, CB monitoring, serially communicated SCADA, control and indication

Hard wire communicated SCADA

TFR tap changer and cooling control circuits

Power factor correction capacitor protection/control

AC Supplies (415/240VAC)

DC Supplies (125/48VDC)

Indication lighting timer circuit

Miscellaneous circuits may include: Metering, frequency injection, radio/communication, intertripping, frame leakage and SMU control

Connection diagrams may incude: Control panels, HV circuit breakers,LV circuit breakers, Line and TFR CT's, TFR neutral CT's, Line VT's, TFR's, disconnectors, battery chargers, fire control panel, power factor and control caps.

Other areas may include: Control panel layouts, control cable schedule and label list.

The following constants and variables included in the element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:

Appropriate and relevant persons (see Personnel)

Appropriate authorities

Appropriate work platform.

Assessing risk

Assessment

Authorisation

Confined space

Diagnostic, testing and restoration.

Documenting detail work events, record keeping and or storage of information.

Drawings and specifications

Emergency

Environmental and sustainable energy procedures

Environmental legislation.

Environmental management documentation.

Established procedures.

Fall prevention

Hazards

Identifying hazards

Inspect

Legislation

MSDS

Notification.

OHS practices

OHS issues

Permits and / or permits to work

Personnel.

Quality assurance systems.

Requirements.

Safe design principles

Testing procedures

Work clearance systems