Elements and Performance Criteria
- Prepare to solve electrical problems on remote community network apparatus
- Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
- Nature of circuit(s) problem is obtained from documentation or from work supervisor to establish the scope of work to be undertaken
- Advice is sought from relevant personnel to ensure work is coordinated effectively with others
- Materials required for work are identified and obtained in accordance with workplace procedures
- Plant, equipment, tools, testing devices and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- Solve electrical problems on network apparatus in a remote community
- Need to test or measure live electrical components is determined in accordance with workplace procedures
- Circuits are checked and isolated in accordance with job requirements and workplace procedures
- Established methods are used to solve electrical problems from measured and calculated values as they apply to remote community network apparatus
- Unplanned events in the solving of electrical problems in remote community network apparatus are responded to in accordance with workplace procedures
- Problems are solved without damage to apparatus, circuits, the surrounding environment or services in accordance with sustainable energy practices and workplace procedures
- Complete work and document problem solving activities
- Worksite is cleaned and made safe in accordance with workplace procedures
- Justification for solutions used to solve circuit problems is documented in accordance with workplace procedures
- Work completion is documented and appropriate personnel notified in accordance with workplace procedures