  1. Prepare to solve problems in energy supply network equipment
  2. Extent of work to be undertaken is determined from reports and/or discussions with relevant person/s
  3. Advice is sought from the work supervisor to ensure the work is coordinated effectively with others
  4. Materials required for work are determined in accordance with workplace procedures
  5. Tools, equipment and testing devices required to take measurements are obtained in accordance with workplace procedures and checked for correct operation and safety
  6. Solve problems in energy supply network equipment
  7. The need to test or measure live work is determined in accordance with WHS/OHS requirements and, when necessary, conducted in accordance with workplace safety procedures
  8. Circuits/machines/plant are isolated, where necessary, in accordance with WHS/OHS requirements and workplace procedures
  9. Safety hazards resulting from reports and risk control measures devised and implemented in consultation with appropriate personnel
  10. Problem solving of energy network equipment is approached methodically using measured and calculated values of circuit/apparatus parameters
  11. Circuit/apparatus components are dismantled, where necessary, and parts stored to protect them against loss or damage
  12. Circuits/components are rechecked and their operational status is confirmed
  13. Materials/replacement parts required to solve problems are sourced and obtained in accordance with workplace procedures
  14. Effectiveness of the repair is tested in accordance with workplace procedures
  15. Apparatus is reassembled, tested and prepared for return to service
  16. Unplanned events are dealt with safely and with the approval of relevant personnel
  17. Problem-solving activities are completed without damage to apparatus, circuits, the surrounding environment or services applying sustainable energy practices
  18. Complete and report on problem solving in energy supply network equipment
  19. Reusable, faulty or worn components are tagged and dispatched for repair to maintain adequate spares
  20. Maintenance work activities are documented in accordance with workplace procedures