Elements and Performance Criteria
- Prepare to perform rescue from switchyard structures at heights
- Tools and emergency equipment are checked for safety, functionality and placed in an accessible location to facilitate response and rescue according to established procedures
- Carry out rescue from switchyard structures at heights
- Workplace procedures for accessing the switchyard structure, and removing the victim, where necessary, from contact with live apparatus are followed
- Workplace procedures for attaching the emergency lowering equipment and lowering the victim to the ground are followed
- Workplace procedures for carrying out cardiopulmonary resuscitation (CPR) if required at the site, and treatment, where necessary, by medical professionals are followed
- The worksite is secured and entry controlled until appropriate authorities inspect and release the site
- Complete rescue procedures from switchyard structures at heights