Scope
This qualification provides competencies in mandatory and contractual inspections of electrical systems and auditing of entities for compliance with electrical safety requirements. It includes ERAC requirements for an ‘Electrician’s licence’.
Subjects
Completion requirements
The requirements for granting this qualification will be met when competency is demonstrated and achieved for:
All the Core competency standard units, defined in the Core Competency Standard Units table below and
A combination of Elective competency standard units to achieve a total weighting of 220 points in accordance with the Elective Competency Standard Units table below.
Note: UEENEEG105A - Those holding an Unrestricted Electricians Licence or equivalent issued in an Australian State or Territory meets the requirements of this unit and its pre-requisite requirements.
Implement and monitor energy sector policies and procedures for environmental and sustainable work practices
20
Total points in core
1060
Elective Competency Standard Units
Complete Elective units to achieve a total of weighting of 220 points from the following groups:
Group
Minimum points
Maximum points
A
Imported and Common Elective Units
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points.
0
80
B
Qualification Elective Units
0
110
C
Qualification Elective Units
You may select all your elective units from this Group
110
220
Group A Imported and Common Elective Units
You may complete units to a maximum weighting of 80
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points.
Note: For further information see Application of the NQC Flexibility Formula, UEE11 Electrotechnology Training Package, Version 1, Volume 1 Qualification Framework
Up to 80 points
Group B Qualification Elective Units
You may complete units to a maximum weighting of 110
Develop compliance policies and plans to conduct a electrical contracting business
80
Note: 1. Prerequisite pathways shall be identified and met for all elective units selected.
2. In selecting elective units considerations to career planning advice should be given to units that form part of a prerequisite pathway for the progression to achieve particular competencies or qualification at a higher level.