Certificate IV in Electrical - Air-conditioning Split Systems
Scope
This qualification provides competencies to select, install, commission, fault find and maintain electrical systems and equipment in buildings and premises and split air-conditioning systems to a prescribed routine where the maximum plant capacity for each system does not exceed 18 kWr. It includes ERAC requirements for an ‘Electrician’s licence’ and regulatory requirements for purchasing and handling refrigerants for split systems.
Split systems include wall hung, floor and ceiling suspended, cassette and ducted fan coil split systems. This qualification excludes competencies required for service, repair, maintenance, or the safe and proper installation of commercial refrigeration and air conditioning plant and equipment.
Note:
1. The letter “r†denotes “refrigeration†or cooling capacity, not electrical input power.
2. The Ozone Protection and Synthetic Greenhouse Gas Legislation Amendment Bill 2003 and the Ozone Protection and Synthetic Gas Management Regulations apply to this qualification. Prior to planning the delivery of any training and/or assessment activities all legislative and regulatory requirements shall be identified and included.