These units from CPP07 Property Services Training Package meet industry requirements for installing and decommissioning fixed fire extinguishing systems.


Audience

Competency in this skill set is for people who:

1

Install and decommission a gaseous fire extinguishing system (fire protection equipment) including to:

a

install and disconnect actuation devices (mechanisms) to and from container valves; and

b

install and disconnect gaseous agent containers; and

c

install and disconnect any interconnections to other gaseous system containers; and

d

install and disconnect ancillary equipment connections to manifold and pipework; and

e

attach and remove transport equipment, such as valve outlet and actuator port caps, plugs and locking devices installed to prevent accidental discharge.

2

Commission actuation control devices set to operate and engage safety devices as needed and decommission these devices.

This skill set meets the full licensing requirements of the Extinguishing Agent Handling Licence: Install and Decommission Fixed Systems.


Subjects

The Install and Decommission Fixed Fire Extinguishing Systems Skill Set consists of:


add topic CPPCMN2002A

Participate in workplace safety arrangements

add topic CPPFES2003A

Safely move loads and dangerous goods

add topic CPPFES2006A

Prepare for installation and servicing operations

add topic CPPFES2043A

Prevent ozone depleting substance and synthetic greenhouse gas emissions

add topic CPPFES3044A

Interpret installation requirements for gaseous fire-suppression systems

add topic CPPFES3045A

Install gaseous agent containers and actuators

add topic CPPFES3046A

Decommission gaseous agent containers and actuators


Pathways...

Completion of these units provides credit towards CPP20511 Certificate II in Fire Protection Inspection and Testing and CPP30811 Certificate III in Fire Protection Inspection and Testing.

This skill set meets the full licensing requirements of the Extinguishing Agent Handling Licence: Fixed System Installation and Decommissioning.