Statement of Attainment

These competencies from the TLI10 Transport and Logistics Training Package (Version 2) meet the needs of rail plant operation. The units of competency are drawn from a nationally endorsed Training Package, and provide the skills and knowledge for a person required to propel and operate light on-track equipment in the general rail infrastructure environment.


Audience

This is a skill set covering a role requiring the operation of light on-track equipment in the general rail infrastructure environment.


Subjects

The Light On-track Equipment Operation Skill Set consists of:


A total of 2 units of competency must be completed.

Units

add topic TLIB2085A

Apply track fundamentals

add topic TLIC2059A

Propel and operate light on-track equipment


Pathways...

This skill set is to be undertaken in addition to the core units from Certificate II in Rail Infrastructure and targets those rail track workers who will propel and operate basic mechanical or hydraulic light on-track equipment. Light on-track equipment is considered to be less than 10 tonnes that may be lifted on or off track mechanically.