Units of competency
- ZBECCA0301A Complete workplace calculations
- ZBECCA0302A Maintain records
- ZBECCA0303A Plan a personal budget
- ZBECOR0301A Implement Occupational Health and Safety Procedures
- ZBECOR0302A Monitor on site Occupational Health and Safety Compliance
- ZBECOR0303A Conduct work site housekeeping and maintain environmental controls
- ZBECOR0304A Use materials and process knowledge to assist in plastering operations
- ZBECOR0305A Complete Workplace Induction
- ZBECOR0306A Work safely at heights
- ZBECOR0307A Work within the quality system
- ZBECOR0308A Apply levels of finish standards to planning and inspection of own work.
- ZBECOR0309A Mix plastering compounds
- ZBECOR0310A Measure work and plan materials use
- ZBEMHA0301A Load and unload plaster and plaster related products
- ZBEMHA0302A Use manual handling equipment to manoeuvre plaster products
- ZBEMHA0303A Store plasterboard/products
- ZBEOHS0401A Complete on site risk assessment and control procedures
- ZBEPOP0301A Fix standard plasterboard wall sheets
- ZBEPOP0302A Fix standard plasterboard ceiling sheets
- ZBEPOP0303A Fix Battens
- ZBEPOP0304A Fix wet area plaster sheets
- ZBEPOP0305A Fix ceilings to external protected areas.
- ZBEPOP0306A Fix curved wall systems
- ZBEPOP0307A Install batt insulation products
- ZBEPOP0308A Fix fibre cement board
- ZBEPOP0309A Install and finish columns
- ZBEPOP0310A Finish plasterboard joins by hand
- ZBEPOP0311A Rectify faults in plaster applications
- ZBEPOP0312A Cut and fix paper faced cornice
- ZBEPOP0313A Use vacuum/electric sanding equipment to finish plaster work
- ZBEPOP0314A Hand sand plaster work
- ZBEPOP0315A Install partiwall plaster products
- ZBEPOP0316A Match mitre and install cast ornamental cornice
- ZBEPOP0317A Install and fix residential acoustic rated plaster products
- ZBEPOP0318A Install and fix residential fire rated plaster products
- ZBEPOP0319A Use mechanical jointing equipment to finish joints
- ZBEPOP0320A Finish Category 1 & 2 wet areas
- ZBEPOP0321A Set out and shape arches
- ZBEPOP0401A Plan and co-ordinate site operations
- ZBEPOP0402A Diagnose faults in finished interior lining work
- ZBEPOP0403A Conduct interior lining completion inspections
- ZBEPOP0404A Apply BCA and Australian Standards to systems installation and inspection
- ZBESBU0401A Manage employee performance
- ZBESBU0402A Respond to customer complaints
- ZBESBU0403A Co-ordinate Contractor performance
- ZBESBU0404A Purchase materials and equipment
- ZBESBU0405A Quote for work
- ZBESBU0406A Introduce new team members
- ZBESBU0407A Lead workgroup
- ZBEWPO0301A Provide quality service to customers
- ZBEWPO0302A Plan travel routes
- ZBEWPO0303A Erect and maintain trestle and plank systems
- ZBEWPO0304A Inspect equipment for serviceability
- ZBEWPO0305A Set up, move and dismantle scaffolding up to 4 meters