Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AHCDRG301A Mapping and Delivery Guide
Install drainage systems

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency AHCDRG301A - Install drainage systems
Description This unit covers the process of installing surface and/or subsurface drainage systems and defines the standard required to: interpret site specifications and drainage system plans; prepare for installation activities; set out, survey, test and excavate the installation site; measure materials; set out drainage system works; install and test the drainage system; level and align earthworks.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit applies to workers in land conservation and irrigation construction and is likely to be carried out under routine supervision within enterprise guidelines.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for drainage system installation activities
  • The construction site for the drainage system and construction method is identified according to the site and drainage system plans and enterprise work procedures.
  • Materials, tools, equipment and machinery are selected according to drainage system design requirements and enterprise work procedures.
  • Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer's specifications and enterprise work procedures.
  • Occupational Health and Safety (OHS) hazards are identified, risks assessed and risk controls implemented.
  • Suitable safety and Personal Protective Equipment (PPE) are selected, used and maintained.
       
Element: Co-ordinate installation work
  • Enterprise work team, contractors and design consultants are identified and work tasks are co-ordinated in a sequential, timely and effective manner in consultation with the supervisor.
  • Installation of the drainage system is undertaken according to OHS requirements and with due consideration of the environmental implications and relevant legislation and regulations.
  • A clean and safe work area is maintained throughout and on completion of work.
       
Element: Prepare the site for installation of drainage system
  • Symbols and terminology are interpreted to ensure the concept of the drainage system plan is clearly understood according to industry practice.
  • Layout of services is identified, depths checked against the site or drainage system plan and discrepancies are reported to the supervisor and the relevant authority.
  • Survey, measurement and marking out of the site and confirmation of soil characteristics relevant to the planned drainage system are completed according to plan specifications and enterprise work procedures.
       
Element: Undertake installation of drainage system
  • Excavations are completed without damage to services, facilities, features and established plants according to plan specifications and enterprise work procedures.
  • The drainage system is installed according to the drainage system plan and enterprise work procedures.
  • The drainage system is tested for configuration, flow rates and capacity consistent with the drainage system plan and according to enterprise work procedures.
  • The supervisor is consulted and remedial action is taken when the drainage system operation does not meet the plan specifications.
       
Element: Complete installation of drainage system
  • Earthworks are finished off to the plan specifications and enterprise work procedures.
  • The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures.
  • Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures.
  • Work outcomes are recorded or reported to the supervisor according to enterprise work procedures.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

interpret site specifications and drainage system plans

prepare for installation activities

set out, survey, test and excavate the installation site

measure materials

set out drainage system works

install and test the drainage system

level and align earthworks.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

identify hazards and implement safe work procedures

set out drainage system works

level and align earthworks

use equipment, tools and machinery

implement and follow relevant enterprise OHS and environmental policies and procedures

use literacy skills to read, interpret and follow organisational policies and procedures, follow sequenced written instructions, record accurately and legible information collected and select and apply procedures for a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning techniques, active listening, clarifying information and consulting with supervisors as required

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to work with and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

the purposes of drainage systems and the application of drainage system plans to the physical situation

drain types, components and installation techniques

environmental impacts of irrigation and drainage systems

soil characteristics

enterprise OHS procedures

environmental impacts of installing drainage systems.

The range statement relates to the unit of competency as a whole.

Drainage systems may include:

surface drains

culverts

mole drains

sand slit

sub-surface traps

pit and trap systems

dune and swale systems

reed beds

water-recycling pumps and baffles.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
The construction site for the drainage system and construction method is identified according to the site and drainage system plans and enterprise work procedures. 
Materials, tools, equipment and machinery are selected according to drainage system design requirements and enterprise work procedures. 
Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer's specifications and enterprise work procedures. 
Occupational Health and Safety (OHS) hazards are identified, risks assessed and risk controls implemented. 
Suitable safety and Personal Protective Equipment (PPE) are selected, used and maintained. 
Enterprise work team, contractors and design consultants are identified and work tasks are co-ordinated in a sequential, timely and effective manner in consultation with the supervisor. 
Installation of the drainage system is undertaken according to OHS requirements and with due consideration of the environmental implications and relevant legislation and regulations. 
A clean and safe work area is maintained throughout and on completion of work. 
Symbols and terminology are interpreted to ensure the concept of the drainage system plan is clearly understood according to industry practice. 
Layout of services is identified, depths checked against the site or drainage system plan and discrepancies are reported to the supervisor and the relevant authority. 
Survey, measurement and marking out of the site and confirmation of soil characteristics relevant to the planned drainage system are completed according to plan specifications and enterprise work procedures. 
Excavations are completed without damage to services, facilities, features and established plants according to plan specifications and enterprise work procedures. 
The drainage system is installed according to the drainage system plan and enterprise work procedures. 
The drainage system is tested for configuration, flow rates and capacity consistent with the drainage system plan and according to enterprise work procedures. 
The supervisor is consulted and remedial action is taken when the drainage system operation does not meet the plan specifications. 
Earthworks are finished off to the plan specifications and enterprise work procedures. 
The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures. 
Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures. 
Work outcomes are recorded or reported to the supervisor according to enterprise work procedures. 

Forms

Assessment Cover Sheet

AHCDRG301A - Install drainage systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCDRG301A - Install drainage systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: