Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AHCDRG401 Mapping and Delivery Guide
Coordinate and supervise installation of an irrigation drainage system

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency AHCDRG401 - Coordinate and supervise installation of an irrigation drainage system
Description
Employability Skills
Learning Outcomes and Application This unit of competency describes the skills and knowledge required to coordinate and supervise the installation of an irrigation drainage system. It applies to individuals who analyse information and exercise judgement to complete a range of skilled activities and demonstrate deep knowledge in a specific technical area. They have accountability for the work of others and analyse, design and communicate solutions to a range of complex problems. All work is carried out to comply with workplace procedures.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must satisfy current standards for RTOs.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Develop and implement construction procedures
  • Develop employment and contract management procedures
  • Develop procedures for controlling and recording site deliveries
  • Develop procedures for recording the hire of plant and equipment
  • Determine work health and safety procedures, including risk assessment
  • Notify client, authorities and agencies of the schedule of works
  • Develop procedures for dealing with environmental issues associated with construction work
       
Element: Organise resource requirements
  • Nominate tasks and timelines, including the required resources for each
  • Organise labour requirements
  • Verify the correct parts and equipment have been delivered to the site and checked
  • Select and maintain equipment and machinery
  • Allocate jobs and tasks to the work team
  • Carry out safety induction for the task and site
       
Element: Interpret the irrigation drainage system design for the site
  • Determine the purpose, scale and required output of the irrigation system
  • Assess the landscape of the site
  • Determine construction requirements and verify with the designer
  • Select components to meet design specifications and site requirements
       
Element: Supervise preparatory work
  • Interpret plan and supervise preparatory work
  • Take levels and plan earth works
  • Confirm site is cleaned and marked out
  • Confirm drainage structures are pegged out
       
Element: Supervise construction of the drainage system
  • Interpret plan and supervise construction work
  • Confirm trenches are excavated to specification
  • Confirm earth works are carried out appropriately
  • Confirm construction of drainage structures are to specifications
  • Inspect the lay out and joining of pipes
  • Check the fitting and adjustment of fittings and valves and confirm all joints are secured
  • Supervise the installation and testing of the pumping system
       
Element: Commission the irrigation drainage system
  • Start the system up
  • Identify operating faults and take corrective actions as required
  • Use testing and monitoring equipment to monitor system efficacy
  • Make adjustments as required
       
Element: Supervise the rehabilitation of the works area
  • Monitor the resurfacing and sealing earthworks
  • Confirm the planting and maintenance of vegetation areas have been carried out
  • Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Develop and implement construction procedures

1.1 Develop employment and contract management procedures

1.2 Develop procedures for controlling and recording site deliveries

1.3 Develop procedures for recording the hire of plant and equipment

1.4 Determine work health and safety procedures, including risk assessment

1.5 Notify client, authorities and agencies of the schedule of works

1.6 Develop procedures for dealing with environmental issues associated with construction work

2. Organise resource requirements

2.1 Nominate tasks and timelines, including the required resources for each

2.2 Organise labour requirements

2.3 Verify the correct parts and equipment have been delivered to the site and checked

2.4 Select and maintain equipment and machinery

2.5 Allocate jobs and tasks to the work team

2.6 Carry out safety induction for the task and site

3. Interpret the irrigation drainage system design for the site

3.1 Determine the purpose, scale and required output of the irrigation system

3.2 Assess the landscape of the site

3.3 Determine construction requirements and verify with the designer

3.4 Select components to meet design specifications and site requirements

4. Supervise preparatory work

4.1 Interpret plan and supervise preparatory work

4.2 Take levels and plan earth works

4.3 Confirm site is cleaned and marked out

4.4 Confirm drainage structures are pegged out

5. Supervise construction of the drainage system

5.1 Interpret plan and supervise construction work

5.2 Confirm trenches are excavated to specification

5.3 Confirm earth works are carried out appropriately

5.4 Confirm construction of drainage structures are to specifications

5.5 Inspect the lay out and joining of pipes

5.6 Check the fitting and adjustment of fittings and valves and confirm all joints are secured

5.7 Supervise the installation and testing of the pumping system

6. Commission the irrigation drainage system

6.1 Start the system up

6.2 Identify operating faults and take corrective actions as required

6.3 Use testing and monitoring equipment to monitor system efficacy

6.4 Make adjustments as required

7. Supervise the rehabilitation of the works area

7.1 Monitor the resurfacing and sealing earthworks

7.2 Confirm the planting and maintenance of vegetation areas have been carried out

7.3 Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

conduct a work health and safety risk assessment

develop operational procedures

document requirements for structures

estimate quantities and volumes of soil to be moved

implement employment procedures

interpret irrigation designs

supervise workers in:

earth moving and construction procedures

power and pumping plant installation

pump and gated pipe installation

construction of canals, channels, head ditches, beds, check structures, tailwater holding ponds

The candidate must demonstrate knowledge of:

principles and practices of irrigation drainage system installation

components used in drainage systems

drainage appliances, fixtures and fittings

environmental impacts of drainage systems

environmental role of drainage systems

isolation processes and procedures

level and align site

levelling and alignment processes

measuring and monitoring procedures for factors contributing to drainage system performance

positive and negative environmental impacts of drainage systems

regulatory requirements, codes of practice and relevant enterprise service standards relating to blockage removal, disconnection and reconnection activities

soil moisture measurement procedures

types and operational parameters of drains

water authority standards and procedures

water quality monitoring methods and techniques

water table and salinity measures


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Develop and implement construction procedures

1.1 Develop employment and contract management procedures

1.2 Develop procedures for controlling and recording site deliveries

1.3 Develop procedures for recording the hire of plant and equipment

1.4 Determine work health and safety procedures, including risk assessment

1.5 Notify client, authorities and agencies of the schedule of works

1.6 Develop procedures for dealing with environmental issues associated with construction work

2. Organise resource requirements

2.1 Nominate tasks and timelines, including the required resources for each

2.2 Organise labour requirements

2.3 Verify the correct parts and equipment have been delivered to the site and checked

2.4 Select and maintain equipment and machinery

2.5 Allocate jobs and tasks to the work team

2.6 Carry out safety induction for the task and site

3. Interpret the irrigation drainage system design for the site

3.1 Determine the purpose, scale and required output of the irrigation system

3.2 Assess the landscape of the site

3.3 Determine construction requirements and verify with the designer

3.4 Select components to meet design specifications and site requirements

4. Supervise preparatory work

4.1 Interpret plan and supervise preparatory work

4.2 Take levels and plan earth works

4.3 Confirm site is cleaned and marked out

4.4 Confirm drainage structures are pegged out

5. Supervise construction of the drainage system

5.1 Interpret plan and supervise construction work

5.2 Confirm trenches are excavated to specification

5.3 Confirm earth works are carried out appropriately

5.4 Confirm construction of drainage structures are to specifications

5.5 Inspect the lay out and joining of pipes

5.6 Check the fitting and adjustment of fittings and valves and confirm all joints are secured

5.7 Supervise the installation and testing of the pumping system

6. Commission the irrigation drainage system

6.1 Start the system up

6.2 Identify operating faults and take corrective actions as required

6.3 Use testing and monitoring equipment to monitor system efficacy

6.4 Make adjustments as required

7. Supervise the rehabilitation of the works area

7.1 Monitor the resurfacing and sealing earthworks

7.2 Confirm the planting and maintenance of vegetation areas have been carried out

7.3 Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Develop employment and contract management procedures 
Develop procedures for controlling and recording site deliveries 
Develop procedures for recording the hire of plant and equipment 
Determine work health and safety procedures, including risk assessment 
Notify client, authorities and agencies of the schedule of works 
Develop procedures for dealing with environmental issues associated with construction work 
Nominate tasks and timelines, including the required resources for each 
Organise labour requirements 
Verify the correct parts and equipment have been delivered to the site and checked 
Select and maintain equipment and machinery 
Allocate jobs and tasks to the work team 
Carry out safety induction for the task and site 
Determine the purpose, scale and required output of the irrigation system 
Assess the landscape of the site 
Determine construction requirements and verify with the designer 
Select components to meet design specifications and site requirements 
Interpret plan and supervise preparatory work 
Take levels and plan earth works 
Confirm site is cleaned and marked out 
Confirm drainage structures are pegged out 
Interpret plan and supervise construction work 
Confirm trenches are excavated to specification 
Confirm earth works are carried out appropriately 
Confirm construction of drainage structures are to specifications 
Inspect the lay out and joining of pipes 
Check the fitting and adjustment of fittings and valves and confirm all joints are secured 
Supervise the installation and testing of the pumping system 
Start the system up 
Identify operating faults and take corrective actions as required 
Use testing and monitoring equipment to monitor system efficacy 
Make adjustments as required 
Monitor the resurfacing and sealing earthworks 
Confirm the planting and maintenance of vegetation areas have been carried out 
Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner 

Forms

Assessment Cover Sheet

AHCDRG401 - Coordinate and supervise installation of an irrigation drainage system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCDRG401 - Coordinate and supervise installation of an irrigation drainage system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: