Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AHCINF304 Mapping and Delivery Guide
Install and terminate extra low voltage wiring systems

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency AHCINF304 - Install and terminate extra low voltage wiring systems
Description
Employability Skills
Learning Outcomes and Application This unit of competency describes the skills and knowledge required to install wiring enclosures, cable support systems, cables and accessories in electrical systems of 36 volts or less.All work must be carried out to comply with workplace procedures, work health and safety requirements, relevant legislation and codes and manufacturer’s specifications. This unit applies to individuals who work under broad direction and take responsibility for their own work including limited responsibility for the work of others. They use discretion and judgement in the selection and use of available resources.Licensing, legislative, regulatory or certification requirements may apply to this unit. Specific determination should be sought through the relevant State or Territory.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Competency is to be assessed in the workplace or simulated environment that accurately reflects performance in a real workplace setting.

Assessors must satisfy current standards for RTOs.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for installation of extra low voltage wiring
  • Plan and prepare installation to ensure policies and procedures are followed, and the work is appropriately sequenced according to requirements
  • Consult with appropriate personnel to ensure the work is co-ordinated effectively with others on the work site
  • Size cables and wires to suit calculated load
  • Check wiring system components against job requirements
  • Source accessories according to established procedures and to comply with organisational and task requirements
  • Determine location in which specific items of accessories, apparatus and circuits are to be installed from job requirements
  • Obtain materials necessary to complete the work according to established procedures and checked against the job requirement
  • Source tools, equipment and testing devices needed to carry out the installation work, checked for correct operation and safety
  • Check preparatory work to ensure that it complies with requirements and no unnecessary damage has occurred
       
Element: Install wiring systems
  • Follow work health and safety policies and procedures for installing electrical wiring systems
  • Install wiring systems to meet requirements without damage or distortion to the surrounding environment or services
  • Terminate accessories and connect wire as required to solenoids and controllers, according to manufacturer and enterprise requirements
  • Respond to unplanned events or conditions using established procedures
  • Obtain approval from appropriate personnel according to established procedures before any contingencies are implemented
  • Undertake on-going checks of the quality of the work according to established procedures
       
Element: Check and notify completion of work
  • Undertake final checks to ensure the installed wiring systems conform to requirements
  • Test system is to ensure that it works
  • Notify work completion according to established procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare for installation of extra low voltage wiring

1.1 Plan and prepare installation to ensure policies and procedures are followed, and the work is appropriately sequenced according to requirements

1.2 Consult with appropriate personnel to ensure the work is co-ordinated effectively with others on the work site

1.3 Size cables and wires to suit calculated load

1.4 Check wiring system components against job requirements

1.5 Source accessories according to established procedures and to comply with organisational and task requirements

1.6 Determine location in which specific items of accessories, apparatus and circuits are to be installed from job requirements

1.7 Obtain materials necessary to complete the work according to established procedures and checked against the job requirement

1.8 Source tools, equipment and testing devices needed to carry out the installation work, checked for correct operation and safety

1.9 Check preparatory work to ensure that it complies with requirements and no unnecessary damage has occurred

2. Install wiring systems

2.1. Follow work health and safety policies and procedures for installing electrical wiring systems

2.2. Install wiring systems to meet requirements without damage or distortion to the surrounding environment or services

2.3. Terminate accessories and connect wire as required to solenoids and controllers, according to manufacturer and enterprise requirements

2.4. Respond to unplanned events or conditions using established procedures

2.5. Obtain approval from appropriate personnel according to established procedures before any contingencies are implemented

2.6. Undertake on-going checks of the quality of the work according to established procedures

3. Check and notify completion of work

3.1. Undertake final checks to ensure the installed wiring systems conform to requirements

3.2. Test system is to ensure that it works

3.3. Notify work completion according to established procedures

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

identify hazards and implement safe systems of work

read labels and signage to differentiate between extra low voltage and other electrical systems

read and follow manufactures manuals and enterprise procedures for extra low voltage wiring

size cables and wires to suit calculated load

install wiring systems

check and notify completed installation activities

follow enterprise work health and safety procedures and safely work with extra low voltage systems

The candidate must demonstrate knowledge of:

basic electricity and electrical principles relating to extra low voltage wiring

applications, materials and techniques relevant to the industry sector

isolation and tagging procedures

computerised controller systems

enterprise policies and procedures

testing equipment and procedures

relevant legislation and guidelines for installing extra low voltage wiring.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare for installation of extra low voltage wiring

1.1 Plan and prepare installation to ensure policies and procedures are followed, and the work is appropriately sequenced according to requirements

1.2 Consult with appropriate personnel to ensure the work is co-ordinated effectively with others on the work site

1.3 Size cables and wires to suit calculated load

1.4 Check wiring system components against job requirements

1.5 Source accessories according to established procedures and to comply with organisational and task requirements

1.6 Determine location in which specific items of accessories, apparatus and circuits are to be installed from job requirements

1.7 Obtain materials necessary to complete the work according to established procedures and checked against the job requirement

1.8 Source tools, equipment and testing devices needed to carry out the installation work, checked for correct operation and safety

1.9 Check preparatory work to ensure that it complies with requirements and no unnecessary damage has occurred

2. Install wiring systems

2.1. Follow work health and safety policies and procedures for installing electrical wiring systems

2.2. Install wiring systems to meet requirements without damage or distortion to the surrounding environment or services

2.3. Terminate accessories and connect wire as required to solenoids and controllers, according to manufacturer and enterprise requirements

2.4. Respond to unplanned events or conditions using established procedures

2.5. Obtain approval from appropriate personnel according to established procedures before any contingencies are implemented

2.6. Undertake on-going checks of the quality of the work according to established procedures

3. Check and notify completion of work

3.1. Undertake final checks to ensure the installed wiring systems conform to requirements

3.2. Test system is to ensure that it works

3.3. Notify work completion according to established procedures

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Plan and prepare installation to ensure policies and procedures are followed, and the work is appropriately sequenced according to requirements 
Consult with appropriate personnel to ensure the work is co-ordinated effectively with others on the work site 
Size cables and wires to suit calculated load 
Check wiring system components against job requirements 
Source accessories according to established procedures and to comply with organisational and task requirements 
Determine location in which specific items of accessories, apparatus and circuits are to be installed from job requirements 
Obtain materials necessary to complete the work according to established procedures and checked against the job requirement 
Source tools, equipment and testing devices needed to carry out the installation work, checked for correct operation and safety 
Check preparatory work to ensure that it complies with requirements and no unnecessary damage has occurred 
Follow work health and safety policies and procedures for installing electrical wiring systems 
Install wiring systems to meet requirements without damage or distortion to the surrounding environment or services 
Terminate accessories and connect wire as required to solenoids and controllers, according to manufacturer and enterprise requirements 
Respond to unplanned events or conditions using established procedures 
Obtain approval from appropriate personnel according to established procedures before any contingencies are implemented 
Undertake on-going checks of the quality of the work according to established procedures 
Undertake final checks to ensure the installed wiring systems conform to requirements 
Test system is to ensure that it works 
Notify work completion according to established procedures 

Forms

Assessment Cover Sheet

AHCINF304 - Install and terminate extra low voltage wiring systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCINF304 - Install and terminate extra low voltage wiring systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: