Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AHCIRG333 Mapping and Delivery Guide
Maintain pressurised irrigation systems

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency AHCIRG333 - Maintain pressurised irrigation systems
Description
Employability Skills
Learning Outcomes and Application This unit of competency covers the skills and knowledge required to implement a low volume or sprinkler irrigation maintenance program.It applies to individuals who take responsibility for own work and for the quality of the work of others. They use discretion and judgement in the selection, allocation and use of available resources. All work is carried out to comply with workplace procedures.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must satisfy current standards for RTOs.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Interpret a low volume irrigation maintenance program
  • Determine the scope of maintenance
  • Determine the frequency of maintenance works
  • Establish irrigation maintenance standards
  • Plan and prepare maintenance works
  • Identify work health and safety hazards, assess risks and implement suitable controls
  • Identify environmental considerations of irrigation maintenance activities
  • Select and use suitable personal protective equipment
       
Element: Inspect an irrigation system
  • Create an inspection checklist and inspect the system regularly
  • Identify remedial action required and undertake repairs to restore system to full effectiveness
  • Undertake servicing of mechanical equipment
  • Assess the results of maintenance works and record to ensure repairs or maintenance standards have been achieved
       
Element: Carry out periodic system maintenance
  • Record damage and blockages with contaminants by damage type, location and the section of the system affected
  • Record and report damaged or faulty components and computer control systems and take action to effect repairs
  • Implement end of season maintenance procedures
  • Implement routine and preventative maintenance procedures
       
Element: Record and report maintenance activities
  • Restore site and clear materials and equipment from the site on completion of maintenance works
  • Complete maintenance and servicing records
  • Record parts removed or replaced
  • Record or report faults and breakages
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Interpret a low volume irrigation maintenance program

1.1 Determine the scope of maintenance

1.2 Determine the frequency of maintenance works

1.3 Establish irrigation maintenance standards

1.4 Plan and prepare maintenance works

1.5 Identify work health and safety hazards, assess risks and implement suitable controls

1.6 Identify environmental considerations of irrigation maintenance activities

1.7 Select and use suitable personal protective equipment

2. Inspect an irrigation system

2.1 Create an inspection checklist and inspect the system regularly

2.2 Identify remedial action required and undertake repairs to restore system to full effectiveness

2.3 Undertake servicing of mechanical equipment

2.4 Assess the results of maintenance works and record to ensure repairs or maintenance standards have been achieved

3. Carry out periodic system maintenance

3.1 Record damage and blockages with contaminants by damage type, location and the section of the system affected

3.2 Record and report damaged or faulty components and computer control systems and take action to effect repairs

3.3 Implement end of season maintenance procedures

3.4 Implement routine and preventative maintenance procedures

4. Record and report maintenance activities

4.1 Restore site and clear materials and equipment from the site on completion of maintenance works

4.2 Complete maintenance and servicing records

4.3 Record parts removed or replaced

4.4 Record or report faults and breakages

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

check connections and controllers

check sprinkler/emitter output and function

confirm operational pressures

ensure proper operation of automatic flush valves

interpret and apply maintenance procedures

remove, service and replace valves and filters

test irrigation equipment

The candidate must demonstrate knowledge of:

principles and practices of irrigation system maintenance

characteristics and operation of pipes, joints, valves, emitters

common operational and maintenance problems

components of an irrigation system

operation of pumps and water flow rates

sprinkler/low volume irrigation system components


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Interpret a low volume irrigation maintenance program

1.1 Determine the scope of maintenance

1.2 Determine the frequency of maintenance works

1.3 Establish irrigation maintenance standards

1.4 Plan and prepare maintenance works

1.5 Identify work health and safety hazards, assess risks and implement suitable controls

1.6 Identify environmental considerations of irrigation maintenance activities

1.7 Select and use suitable personal protective equipment

2. Inspect an irrigation system

2.1 Create an inspection checklist and inspect the system regularly

2.2 Identify remedial action required and undertake repairs to restore system to full effectiveness

2.3 Undertake servicing of mechanical equipment

2.4 Assess the results of maintenance works and record to ensure repairs or maintenance standards have been achieved

3. Carry out periodic system maintenance

3.1 Record damage and blockages with contaminants by damage type, location and the section of the system affected

3.2 Record and report damaged or faulty components and computer control systems and take action to effect repairs

3.3 Implement end of season maintenance procedures

3.4 Implement routine and preventative maintenance procedures

4. Record and report maintenance activities

4.1 Restore site and clear materials and equipment from the site on completion of maintenance works

4.2 Complete maintenance and servicing records

4.3 Record parts removed or replaced

4.4 Record or report faults and breakages

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Determine the scope of maintenance 
Determine the frequency of maintenance works 
Establish irrigation maintenance standards 
Plan and prepare maintenance works 
Identify work health and safety hazards, assess risks and implement suitable controls 
Identify environmental considerations of irrigation maintenance activities 
Select and use suitable personal protective equipment 
Create an inspection checklist and inspect the system regularly 
Identify remedial action required and undertake repairs to restore system to full effectiveness 
Undertake servicing of mechanical equipment 
Assess the results of maintenance works and record to ensure repairs or maintenance standards have been achieved 
Record damage and blockages with contaminants by damage type, location and the section of the system affected 
Record and report damaged or faulty components and computer control systems and take action to effect repairs 
Implement end of season maintenance procedures 
Implement routine and preventative maintenance procedures 
Restore site and clear materials and equipment from the site on completion of maintenance works 
Complete maintenance and servicing records 
Record parts removed or replaced 
Record or report faults and breakages 

Forms

Assessment Cover Sheet

AHCIRG333 - Maintain pressurised irrigation systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCIRG333 - Maintain pressurised irrigation systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: