Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AHCLSC309A Mapping and Delivery Guide
Install water features

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency AHCLSC309A - Install water features
Description This unit covers the process of installing water features and defines the standard required to: prepare site for water feature installation; construct/assemble, install and commission water feature/s.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit applies to the installation of water features which may include waterfalls, ponds, waterways and fountains. They may be prefabricated water features as supplied by irrigation suppliers and garden centres, or they may be formed 'in situ' with the appropriate waterproof membrane and medium.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare work
  • Plans and specifications are interpreted and clarified with the supervisor.
  • The quantity and quality of materials are checked to ensure they conform to design drawings and specifications.
  • Tools and equipment are selected and checked for serviceability according to enterprise guidelines.
  • Occupational Health and Safety (OHS) hazards are identified, risks assessed and controls implemented.
  • Environmental implications of constructing concrete structures are identified and reported to the supervisor.
       
Element: Set out and prepare the site
  • Services are determined and located from site plans.
  • The exact location and depth of excavations is determined from design drawings and specifications, and marked out accordingly.
  • Site is excavated to the shape, depth and dimensions as marked out.
  • Drainage systems are constructed according to design drawings and specifications.
  • Bedding material is placed and compacted to the required finished levels.
  • Soil and waste material is sorted and stockpiled ready for removal, reuse or recycling.
       
Element: Install water feature and accessories
  • A waterproof membrane, prefabricated shell or formed 'in situ' feature is installed according to design drawings, specifications and/or manufacturer's instructions.
  • All accessories to the feature are installed according to design drawings, specifications and/or manufacturer's instructions, and with due consideration to safety issues.
  • The feature is filled with water, tested for leaks and repaired accordingly.
  • Water is treated to remove or neutralise contaminants resulting from excavation and installation work.
       
Element: Check quality of work and clean up site
  • Any mechanical features are checked and adjusted to ensure they operate according to manufacturer's specifications.
  • Quality of finished works is inspected to ensure the standard of the finished feature is in accordance with design drawings and specifications.
  • Debris is cleaned from feature and site according to enterprise guidelines.
  • Soil and waste material is disposed of in an environmentally aware and sensitive manner.
  • All tools and equipment are cleaned and stored according to enterprise guidelines.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

prepare site for water feature installation

construct/assemble, install and commission water feature/s.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

measure and calculate area, depth and volume

use some surveyors instruments

install various types of prefabricated water features and/or form them 'in situ'

use literacy skills to read, interpret and follow organisational policies and procedures, follow sequenced written instructions, record accurately and legible information collected and select and apply procedures for a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning techniques, active listening, clarifying information and consulting with supervisors as required

use interpersonal skills to work with and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

regulations regarding water use and safety in public places

pumping systems and accessories associated with water features

pipe sizes, types and applications

plant materials, fish and water animals suitable for various types of water features

water treatment methods

comparative environmental implications associated with soil excavation and the establishment of drainage systems and water catchment features

legislative and regulatory requirements with water feature installation.

The range statement relates to the unit of competency as a whole.

Water feature may include:

waterfalls

ponds

waterways

fountains which may be prefabricated or formed 'in situ'.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Plans and specifications are interpreted and clarified with the supervisor. 
The quantity and quality of materials are checked to ensure they conform to design drawings and specifications. 
Tools and equipment are selected and checked for serviceability according to enterprise guidelines. 
Occupational Health and Safety (OHS) hazards are identified, risks assessed and controls implemented. 
Environmental implications of constructing concrete structures are identified and reported to the supervisor. 
Services are determined and located from site plans. 
The exact location and depth of excavations is determined from design drawings and specifications, and marked out accordingly. 
Site is excavated to the shape, depth and dimensions as marked out. 
Drainage systems are constructed according to design drawings and specifications. 
Bedding material is placed and compacted to the required finished levels. 
Soil and waste material is sorted and stockpiled ready for removal, reuse or recycling. 
A waterproof membrane, prefabricated shell or formed 'in situ' feature is installed according to design drawings, specifications and/or manufacturer's instructions. 
All accessories to the feature are installed according to design drawings, specifications and/or manufacturer's instructions, and with due consideration to safety issues. 
The feature is filled with water, tested for leaks and repaired accordingly. 
Water is treated to remove or neutralise contaminants resulting from excavation and installation work. 
Any mechanical features are checked and adjusted to ensure they operate according to manufacturer's specifications. 
Quality of finished works is inspected to ensure the standard of the finished feature is in accordance with design drawings and specifications. 
Debris is cleaned from feature and site according to enterprise guidelines. 
Soil and waste material is disposed of in an environmentally aware and sensitive manner. 
All tools and equipment are cleaned and stored according to enterprise guidelines. 

Forms

Assessment Cover Sheet

AHCLSC309A - Install water features
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCLSC309A - Install water features

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: