Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AHCSAW502A Mapping and Delivery Guide
Plan erosion and sediment control measures

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency AHCSAW502A - Plan erosion and sediment control measures
Description This unit covers the development of erosion and sediment control plans and defines the standard required to: establish suitability of development proposal; prepare reports on erosion and sediment control plans; check selection criteria for earthwork structures or measures against industry guidelines; develop erosion and sediment control strategy; prepare an erosion and sediment control plan.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit applies to land managers in land disturbing projects for local government, urban, civil construction, forestry, extractive industry, rural, or natural resource management.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Establish suitability of development proposal
  • Data concerning suitability of development site is compiled using industry methodology.
  • Alterations or modifications to the development plan are noted and reported to developer or consent authority.
  • Compliance is established with relevant regulatory planning authority or environmental legislation following industry procedures.
  • Concurrence is established relating to suitability of development proposal and conforms to erosion and sediment control guidelines.
       
Element: Develop erosion and sediment control strategy
  • Erosion control measures are developed consistent with industry principles and selection criteria.
  • Sediment control measures are developed consistent with industry principles and selection criteria.
  • Erosion and sediment control strategies are established and documented in co-operation with the developer and relevant consent authority.
       
Element: Prepare an erosion and sediment control plan
  • Selection criteria for earthwork structures or measures are checked against industry guidelines.
  • Design specifications for structures incorporated in plan details.
  • Erosion and sediment control plan and documentation supporting the plan follow industry guidelines.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

establish suitability of development proposal

prepare reports on erosion and sediment control plans

check selection criteria for earthwork structures or measures against industry guidelines

develop erosion and sediment control strategy

prepare an erosion and sediment control plan.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

establish suitability of development proposal

prepare reports on erosion and sediment control plans

develop erosion and sediment control strategy

prepare an erosion and sediment control plan

use literacy skills to fulfil job roles as required by the organisation. The level of skill may range from reading and understanding documentation to completion of written reports

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification, negotiating solutions and responding to a range of views

use numeracy skills to estimate, calculate and record complex workplace measures

use interpersonal skills to work with others and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

relevant environmental, planning and groundwater legislation

planning process for erosion and sediment control

erosion control and design principles

soils and soil formation

levels and levelling

earthmoving principles

total catchment issues

legal requirements - permits

environmental issues

country code

managing peak water flows

subsurface and surface drainage principles and systems

awareness of the limitations of design aids provided for industry.

The range statement relates to the unit of competency as a whole.

Earthworks may include:

the range of conservation earthworks on rural lands including:

contour banks

waterways

dams

drainage structures.

Erosion control measures may include:

site management

land shaping

batter stabilisation

banks and channels

level spreader

revegetation

waterways

check dams

bank and channel linings

grade stabilising structures

outlet protection structures

stormwater detention measures

dust control

rural road&track crossbank and crossfall.

Sediment control measures may include:

sediment basins

sediment traps

sediment filters

excavated sediment traps

straw bale

stormwater inlet sediment traps

sediment fence

straw bale

geotextile fabric

vegetation strips.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Data concerning suitability of development site is compiled using industry methodology. 
Alterations or modifications to the development plan are noted and reported to developer or consent authority. 
Compliance is established with relevant regulatory planning authority or environmental legislation following industry procedures. 
Concurrence is established relating to suitability of development proposal and conforms to erosion and sediment control guidelines. 
Erosion control measures are developed consistent with industry principles and selection criteria. 
Sediment control measures are developed consistent with industry principles and selection criteria. 
Erosion and sediment control strategies are established and documented in co-operation with the developer and relevant consent authority. 
Selection criteria for earthwork structures or measures are checked against industry guidelines. 
Design specifications for structures incorporated in plan details. 
Erosion and sediment control plan and documentation supporting the plan follow industry guidelines. 

Forms

Assessment Cover Sheet

AHCSAW502A - Plan erosion and sediment control measures
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCSAW502A - Plan erosion and sediment control measures

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: