Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AHCWRK308 Mapping and Delivery Guide
Handle bulk materials in storage area

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency AHCWRK308 - Handle bulk materials in storage area
Description
Employability Skills
Learning Outcomes and Application This unit of competency describes the skills and knowledge required to receive, move and sample bulk materials in a storage area.Bulk materials are handled to industry standards and the bulk material storage program in relation to segregation and storage conditions ensuring minimum loss or damage and optimum returns.This unit applies to individuals who work under broad direction and take responsibility for their own work. They use discretion and judgement in the selection and use of available resources.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must satisfy current standards for RTOs.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to work in bulk materials storage area
  • Interpret work to be undertaken from the work program where necessary, and confirmed with supervisor
  • Identify work health and safety hazards, assess risks and implement suitable control measures
  • Select, use and maintain suitable personal protective clothing
  • Select, check and maintain tools and equipment suitable for the work to be undertaken
  • Identify environmental implications of undertaking work in the bulk materials storage area, assess likely outcomes and responsible action taken if necessary
  • Maintain biosecurity protocols at all times
  • Identify legislative, regulatory and industry requirements
  • Design and implement contingency strategies
       
Element: Sample bulk materials for testing
  • Take representative samples of bulk materials for testing in line with the requirements of the bulk materials storage program
  • Undertake sampling safely, following the prescribed guidelines for the activity
  • Prepare representative bulk materials samples for dispatch by clearly labelling and packaging accordingly
  • Dispatch samples to the analysing body
       
Element: Move bulk materials into and out of storage
  • Identify bulk materials for handling and storage from written or verbal instructions
  • Segregate bulk materials according to type, variety and quality characteristics
  • Take measures to minimise insect and weed infestation and contamination during the movement of the bulk materials
  • Check bulk materials regularly for insect infestation and contamination during movement
  • Clean any storage and handling equipment that is used thoroughly after emptying, and dismantle if necessary
  • Select silo types and handling equipment for each bulk material type in relation to their storage characteristics and flow properties
  • Implement suitable measures to minimise the effect of desiccant dusts on the flow properties of bulk materials
  • Update and store records appropriately
       
Element: Repair and maintain storage facility
  • Identify the need for repairs to the facility through observation or instruction
  • Conduct maintenance and repairs as required
  • Complete maintenance records and other appropriate information
  • Clean and maintain workshop and work areas
  • Report maintenance and repairs, damage, malfunctions or irregular performance in machinery, tools and equipment
  • Clean, maintain and store tools and equipment
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to work in bulk materials storage area

1.1 Interpret work to be undertaken from the work program where necessary, and confirmed with supervisor

1.2 Identify work health and safety hazards, assess risks and implement suitable control measures

1.3 Select, use and maintain suitable personal protective clothing

1.4 Select, check and maintain tools and equipment suitable for the work to be undertaken

1.5 Identify environmental implications of undertaking work in the bulk materials storage area, assess likely outcomes and responsible action taken if necessary

1.6 Maintain biosecurity protocols at all times

1.7 Identify legislative, regulatory and industry requirements

1.8 Design and implement contingency strategies

2. Sample bulk materials for testing

2.1 Take representative samples of bulk materials for testing in line with the requirements of the bulk materials storage program

2.2 Undertake sampling safely, following the prescribed guidelines for the activity

2.3 Prepare representative bulk materials samples for dispatch by clearly labelling and packaging accordingly

2.4 Dispatch samples to the analysing body

3. Move bulk materials into and out of storage

3.1 Identify bulk materials for handling and storage from written or verbal instructions

3.2 Segregate bulk materials according to type, variety and quality characteristics

3.3 Take measures to minimise insect and weed infestation and contamination during the movement of the bulk materials

3.4 Check bulk materials regularly for insect infestation and contamination during movement

3.5 Clean any storage and handling equipment that is used thoroughly after emptying, and dismantle if necessary

3.6 Select silo types and handling equipment for each bulk material type in relation to their storage characteristics and flow properties

3.7 Implement suitable measures to minimise the effect of desiccant dusts on the flow properties of bulk materials

3.8 Update and store records appropriately

4. Repair and maintain storage facility

4.1 Identify the need for repairs to the facility through observation or instruction

4.2 Conduct maintenance and repairs as required

4.3 Complete maintenance records and other appropriate information

4.4 Clean and maintain workshop and work areas

4.5 Report maintenance and repairs, damage, malfunctions or irregular performance in machinery, tools and equipment

4.6 Clean, maintain and store tools and equipment

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

check equipment and storage facilities and identify current or impending faults

record bulk materials stocks and movements

conduct silo readings

identify bulk materials pests and damage

use communication systems

sample and conduct a simple analysis of bulk materials

handle and manoeuvring equipment

test bulk materials for moisture, contamination and quality

complete pre-operational checks on basic tools and equipment

perform routine safety, service and maintenance procedures on tools, equipment and machinery

operate hand and independently powered tools and clean equipment to industry standards

clean, securing and storing machinery and equipment

perform basic trouble shooting

recognise and rectifying minor operational faults

handle hazardous substances (fuels) safely

use industry standard terminology.

The candidate must demonstrate knowledge of:

the client's sampling and classification requirements

bulk materials types and characteristics

common bulk materials pests sand problems

legislative requirements, manufacturer’s instructions and workplace procedures

silo operations and configuration, machinery and operating practices

organisation requirements for protective equipment and safe practices in relation to work health and safety

organisation and industry guidelines for segregation of bulk materials quality assurance principles

pre-operational and safety checks, servicing and maintenance procedures for tools and equipment

potential hazards associated with the operation of basic tools and equipment

general machine maintenance procedures

machinery operating principles and operating methods

machinery storage and protection methods

environmental impacts associated with the operation of machinery and equipment

personal protective clothing and equipment and when and how it should be used

cleaning and storage of machinery, equipment and materials

enterprise recording and reporting procedures.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to work in bulk materials storage area

1.1 Interpret work to be undertaken from the work program where necessary, and confirmed with supervisor

1.2 Identify work health and safety hazards, assess risks and implement suitable control measures

1.3 Select, use and maintain suitable personal protective clothing

1.4 Select, check and maintain tools and equipment suitable for the work to be undertaken

1.5 Identify environmental implications of undertaking work in the bulk materials storage area, assess likely outcomes and responsible action taken if necessary

1.6 Maintain biosecurity protocols at all times

1.7 Identify legislative, regulatory and industry requirements

1.8 Design and implement contingency strategies

2. Sample bulk materials for testing

2.1 Take representative samples of bulk materials for testing in line with the requirements of the bulk materials storage program

2.2 Undertake sampling safely, following the prescribed guidelines for the activity

2.3 Prepare representative bulk materials samples for dispatch by clearly labelling and packaging accordingly

2.4 Dispatch samples to the analysing body

3. Move bulk materials into and out of storage

3.1 Identify bulk materials for handling and storage from written or verbal instructions

3.2 Segregate bulk materials according to type, variety and quality characteristics

3.3 Take measures to minimise insect and weed infestation and contamination during the movement of the bulk materials

3.4 Check bulk materials regularly for insect infestation and contamination during movement

3.5 Clean any storage and handling equipment that is used thoroughly after emptying, and dismantle if necessary

3.6 Select silo types and handling equipment for each bulk material type in relation to their storage characteristics and flow properties

3.7 Implement suitable measures to minimise the effect of desiccant dusts on the flow properties of bulk materials

3.8 Update and store records appropriately

4. Repair and maintain storage facility

4.1 Identify the need for repairs to the facility through observation or instruction

4.2 Conduct maintenance and repairs as required

4.3 Complete maintenance records and other appropriate information

4.4 Clean and maintain workshop and work areas

4.5 Report maintenance and repairs, damage, malfunctions or irregular performance in machinery, tools and equipment

4.6 Clean, maintain and store tools and equipment

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Interpret work to be undertaken from the work program where necessary, and confirmed with supervisor 
Identify work health and safety hazards, assess risks and implement suitable control measures 
Select, use and maintain suitable personal protective clothing 
Select, check and maintain tools and equipment suitable for the work to be undertaken 
Identify environmental implications of undertaking work in the bulk materials storage area, assess likely outcomes and responsible action taken if necessary 
Maintain biosecurity protocols at all times 
Identify legislative, regulatory and industry requirements 
Design and implement contingency strategies 
Take representative samples of bulk materials for testing in line with the requirements of the bulk materials storage program 
Undertake sampling safely, following the prescribed guidelines for the activity 
Prepare representative bulk materials samples for dispatch by clearly labelling and packaging accordingly 
Dispatch samples to the analysing body 
Identify bulk materials for handling and storage from written or verbal instructions 
Segregate bulk materials according to type, variety and quality characteristics 
Take measures to minimise insect and weed infestation and contamination during the movement of the bulk materials 
Check bulk materials regularly for insect infestation and contamination during movement 
Clean any storage and handling equipment that is used thoroughly after emptying, and dismantle if necessary 
Select silo types and handling equipment for each bulk material type in relation to their storage characteristics and flow properties 
Implement suitable measures to minimise the effect of desiccant dusts on the flow properties of bulk materials 
Update and store records appropriately 
Identify the need for repairs to the facility through observation or instruction 
Conduct maintenance and repairs as required 
Complete maintenance records and other appropriate information 
Clean and maintain workshop and work areas 
Report maintenance and repairs, damage, malfunctions or irregular performance in machinery, tools and equipment 
Clean, maintain and store tools and equipment 

Forms

Assessment Cover Sheet

AHCWRK308 - Handle bulk materials in storage area
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCWRK308 - Handle bulk materials in storage area

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: