Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AMPA3091 Mapping and Delivery Guide
Implement a Quality Assurance program for rendering plant

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency AMPA3091 - Implement a Quality Assurance program for rendering plant
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to implement a Quality Assurance (QA) program in a rendering plant.This unit is applicable to workers in a rendering plant responsible for overseeing or being part of the implementation of a QA program.All work should be carried out to comply with workplace procedures, customer requirements and product specifications.This unit applies to individuals who work under broad direction and take responsibility for their own work including limited responsibility for the work of others. They provide and communicate solutions to a range of predictable problems.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.This unit must be delivered and assessed in the context of Australian meat processing standards and regulations.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Competency must be assessed in an operating rendering plant.

Competency must be demonstrated when implementing a functioning QA program.

As a minimum, the following three forms of assessment must be used:

quiz of underpinning knowledge

workplace demonstration

workplace referee or third-party report of performance over time

Assessors must satisfy the current standards for RTOs.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Implement the QA program for the rendering plant
  • Clearly explain QA procedures and requirements to relevant personnel
  • Coach and monitor staff in the introduction of work instructions and operating procedures
  • Introduce and monitor verification and recording procedures
  • Conduct internal audit to validate the QA program
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Implement the QA program for the rendering plant

1.1 Clearly explain QA procedures and requirements to relevant personnel

1.2 Coach and monitor staff in the introduction of work instructions and operating procedures

1.3 Introduce and monitor verification and recording procedures

1.4 Conduct internal audit to validate the QA program

The candidate must implement a Quality Assurance (QA) program in a rendering plant.

The candidate must:

implement the QA program

identify and implement corrective action

verify the program using sampling, testing and auditing

mentor staff implementing the procedures

apply relevant communication skills relevant to work instructions and Standard Operating Procedures (SOPs)

apply relevant workplace health and safety, regulatory and workplace requirements

The candidate must demonstrate a factual, technical, procedural and theoretical knowledge of:

hazards likely to be encountered in a rendering plant

critical control points for QA monitoring

process flow chart for the rendering operation

relevant workplace health and safety, regulatory and workplace requirements

verification and validation procedures


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Implement the QA program for the rendering plant

1.1 Clearly explain QA procedures and requirements to relevant personnel

1.2 Coach and monitor staff in the introduction of work instructions and operating procedures

1.3 Introduce and monitor verification and recording procedures

1.4 Conduct internal audit to validate the QA program

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Clearly explain QA procedures and requirements to relevant personnel 
Coach and monitor staff in the introduction of work instructions and operating procedures 
Introduce and monitor verification and recording procedures 
Conduct internal audit to validate the QA program 

Forms

Assessment Cover Sheet

AMPA3091 - Implement a Quality Assurance program for rendering plant
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AMPA3091 - Implement a Quality Assurance program for rendering plant

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: