Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

AURETR009 Mapping and Delivery Guide
Install vehicle lighting and wiring systems

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency AURETR009 - Install vehicle lighting and wiring systems
Description
Employability Skills
Learning Outcomes and Application This unit describes the performance outcomes required to install vehicle, vessel or machinery low voltage (LV) direct current (DC) lighting and wiring systems that are not an integral part of vehicle or machinery controller area network databus (CAN-bus) topography. It involves preparing for the task, installing and testing the operation of lighting and wiring systems, and completing workplace processes and documentation.It applies to those working in the automotive service and repair industry. LV lighting and wiring systems include those in agricultural machinery, heavy commercial vehicles, light vehicles, vessels, mobile plant machinery, motorcycles or outdoor power equipment. No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must satisfy NVR/AQTF assessor requirements.

Competency is to be assessed in the workplace or a simulated environment that accurately reflects performance in a real workplace setting.

Assessment must include direct observation of tasks.

Where assessment of competency includes third-party evidence, individuals must provide evidence that links them to the lighting and wiring systems that they have installed, e.g. work orders.

Assessors must verify performance evidence through questioning on skills and knowledge to ensure correct interpretation and application.

The following resources must be made available:

automotive repair workplace or simulated workplace

workplace instructions

two different vehicles, vessels or machinery requiring the installation of LV DC lighting and wiring systems

materials appropriate for installing LV DC lighting and wiring systems

equipment, and hand and power tools appropriate for installing LV lighting and wiring systems.

Prerequisites/co-requisites
Competency Field Electrical
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install, lighting and wiring system
  • Job requirements are determined according to workplace instructions
  • Manufacturer specifications and installation fitting instructions are accessed and interpreted
  • Installation options are analysed and those most appropriate to the circumstances are selected
  • Hazards associated with the work are identified and risks are managed
  • Tools and equipment are selected and checked for serviceability
       
Element: Install and test system
  • Lighting and wiring system and components are checked for correct application and damage
  • Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems
  • Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications
  • Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified
       
Element: Complete work processes
  • Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use
  • Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  • Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures
  • Workplace documentation is processed according to workplace procedures
       
Element: Prepare to install, lighting and wiring system
  • Job requirements are determined according to workplace instructions
  • Manufacturer specifications and installation fitting instructions are accessed and interpreted
  • Installation options are analysed and those most appropriate to the circumstances are selected
  • Hazards associated with the work are identified and risks are managed
  • Tools and equipment are selected and checked for serviceability
       
Element: Install and test system
  • Lighting and wiring system and components are checked for correct application and damage
  • Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems
  • Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications
  • Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified
       
Element: Complete work processes
  • Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use
  • Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  • Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures
  • Workplace documentation is processed according to workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to install, lighting and wiring system

1.1 Job requirements are determined according to workplace instructions

1.2 Manufacturer specifications and installation fitting instructions are accessed and interpreted

1.3 Installation options are analysed and those most appropriate to the circumstances are selected

1.4 Hazards associated with the work are identified and risks are managed

1.5 Tools and equipment are selected and checked for serviceability

2. Install and test system

2.1 Lighting and wiring system and components are checked for correct application and damage

2.2 Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems

2.3 Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications

2.4 Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified

3. Complete work processes

3.1 Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use

3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

3.3 Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures

3.4 Workplace documentation is processed according to workplace procedures

Before competency can be determined, individuals must demonstrate they can perform the following according to the standard defined in the unit’s elements, performance criteria, range of conditions and foundation skills:

install two of the following low voltage (LV) lighting and wiring systems in non controller area network databus (CAN-bus) systems in two different vehicles, vessels or machinery:

trailer lights and wiring harness

driving lights and wiring harness

side clearance lamp

high-mount rear brake lamp

ascent strip light emitting diode (LED) lamp

filament lamp to LED lamp replacement.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to installing vehicle lighting and wiring systems, including procedures for:

using specialised tools and equipment

selecting and using personal protective equipment (PPE)

identifying hazards and controlling risks associated with wearing jewellery while working around high current wiring systems

LV direct current (DC) lighting and wiring systems of the following:

trailer lights and wiring harnesses

driving lights and wiring harnesses

side clearance lamps

high-mount rear brake lamps

ascent strip LED lamps

procedures for installing LV DC lighting and wiring systems, including:

filament lamp to LED lamp replacement

resistance and voltage drop

circuit performance checks

connecting system and components to existing electrical system without causing damage or problems, including:

selecting and soldering wires

selecting and crimping terminals

removing and replacing connectors

removing and replacing existing electrical components

different cable types and sizes and their current carrying capacity

types of wiring systems found in vehicles, vessels or machinery, including:

basic wiring

twisted pair

shielded wiring

techniques for reading and interpreting technical information, fitting instructions, wiring diagrams and graphic symbols

post-installation testing procedures, including:

confirming that electrical system is operating to manufacturer specifications following installation

confirming that no other problems are present as a result of installing LV DC lighting and wiring systems.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to install, lighting and wiring system

1.1 Job requirements are determined according to workplace instructions

1.2 Manufacturer specifications and installation fitting instructions are accessed and interpreted

1.3 Installation options are analysed and those most appropriate to the circumstances are selected

1.4 Hazards associated with the work are identified and risks are managed

1.5 Tools and equipment are selected and checked for serviceability

2. Install and test system

2.1 Lighting and wiring system and components are checked for correct application and damage

2.2 Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems

2.3 Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications

2.4 Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified

3. Complete work processes

3.1 Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use

3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

3.3 Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures

3.4 Workplace documentation is processed according to workplace procedures

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

using specialised tools and equipment

selecting and using personal protective equipment (PPE)

identifying hazards and controlling risks associated with wearing jewellery while working around high current wiring systems.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Job requirements are determined according to workplace instructions 
Manufacturer specifications and installation fitting instructions are accessed and interpreted 
Installation options are analysed and those most appropriate to the circumstances are selected 
Hazards associated with the work are identified and risks are managed 
Tools and equipment are selected and checked for serviceability 
Lighting and wiring system and components are checked for correct application and damage 
Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems 
Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications 
Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified 
Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use 
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected 
Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures 
Workplace documentation is processed according to workplace procedures 
Job requirements are determined according to workplace instructions 
Manufacturer specifications and installation fitting instructions are accessed and interpreted 
Installation options are analysed and those most appropriate to the circumstances are selected 
Hazards associated with the work are identified and risks are managed 
Tools and equipment are selected and checked for serviceability 
Lighting and wiring system and components are checked for correct application and damage 
Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems 
Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications 
Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified 
Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use 
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected 
Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures 
Workplace documentation is processed according to workplace procedures 

Forms

Assessment Cover Sheet

AURETR009 - Install vehicle lighting and wiring systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AURETR009 - Install vehicle lighting and wiring systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: