AURKTA001 Mapping and Delivery Guide
Synchronise plant and equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency AURKTA001 - Synchronise plant and equipment
Description
Employability Skills
Learning Outcomes and Application This unit describes the performance outcomes required to synchronise plant and equipment. It involves preparing for the task, selecting the correct synchronising procedure, carrying out the synchronisation, performing post-synchronising testing, and completing workplace processes and documentation.It applies to those working in the automotive service and repair industry. The plant and equipment include those of agricultural machinery or mobile plant machinery.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must satisfy NVR/AQTF assessor requirements.

Competency is to be assessed in the workplace or a simulated environment that accurately reflects performance in a real workplace setting.

Assessment must include direct observation of tasks.

Where assessment of competency includes third-party evidence, individuals must provide evidence that links them to the plant and equipment that they have synchronised, e.g. repair orders.

Assessors must verify performance evidence through questioning on skills and knowledge to ensure correct interpretation and application.

The following resources must be made available:

automotive repair workplace or simulated workplace

workplace instructions

manufacturer plant and equipment synchronisation specifications

two different pieces of plant and equipment for synchronisation

test equipment for synchronising plant and equipment

tools, equipment and materials appropriate for synchronising plant and equipment.

Prerequisites/co-requisites
Competency Field Mechanical - Mobile Plant
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to undertake synchronising operations
  • Job requirements are determined according to workplace instructions
  • Synchronisation procedures and information are sourced and interpreted
  • Options for synchronisation are analysed and those most appropriate to the circumstances are selected and prepared
  • Hazards associated with the work are identified and risks are managed
  • Synchronisation tools and equipment are selected and checked for serviceability
  • Technical and calibration requirements for synchronisation are sourced, and support equipment is identified and prepared
       
Element: Conduct synchronising operations
  • Synchronising procedures are carried out according to manufacturer specifications, workplace procedures, and safety and environmental requirements
  • Synchronising documentation is completed and reported according to workplace procedures
       
Element: Analyse results
  • Operational tests are carried out and results are compared with manufacturer specifications
  • Results are documented and reported according to workplace procedures
       
Element: Complete work processes
  • Final inspection is made to ensure work is to workplace expectations and plant and equipment are presented ready for use, including protective guards, safety features and cowlings
  • Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  • Tools and equipment are checked and stored according to workplace procedures
  • Workplace documentation is processed according to workplace procedures
       
Element: Prepare to undertake synchronising operations
  • Job requirements are determined according to workplace instructions
  • Synchronisation procedures and information are sourced and interpreted
  • Options for synchronisation are analysed and those most appropriate to the circumstances are selected and prepared
  • Hazards associated with the work are identified and risks are managed
  • Synchronisation tools and equipment are selected and checked for serviceability
  • Technical and calibration requirements for synchronisation are sourced, and support equipment is identified and prepared
       
Element: Conduct synchronising operations
  • Synchronising procedures are carried out according to manufacturer specifications, workplace procedures, and safety and environmental requirements
  • Synchronising documentation is completed and reported according to workplace procedures
       
Element: Analyse results
  • Operational tests are carried out and results are compared with manufacturer specifications
  • Results are documented and reported according to workplace procedures
       
Element: Complete work processes
  • Final inspection is made to ensure work is to workplace expectations and plant and equipment are presented ready for use, including protective guards, safety features and cowlings
  • Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  • Tools and equipment are checked and stored according to workplace procedures
  • Workplace documentation is processed according to workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to undertake synchronising operations

1.1 Job requirements are determined according to workplace instructions

1.2 Synchronisation procedures and information are sourced and interpreted

1.3 Options for synchronisation are analysed and those most appropriate to the circumstances are selected and prepared

1.4 Hazards associated with the work are identified and risks are managed

1.5 Synchronisation tools and equipment are selected and checked for serviceability

1.6 Technical and calibration requirements for synchronisation are sourced, and support equipment is identified and prepared

2. Conduct synchronising operations

2.1 Synchronising procedures are carried out according to manufacturer specifications, workplace procedures, and safety and environmental requirements

2.2 Synchronising documentation is completed and reported according to workplace procedures

3. Analyse results

3.1 Operational tests are carried out and results are compared with manufacturer specifications

3.2 Results are documented and reported according to workplace procedures

4. Complete work processes

4.1 Final inspection is made to ensure work is to workplace expectations and plant and equipment are presented ready for use, including protective guards, safety features and cowlings

4.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

4.3 Tools and equipment are checked and stored according to workplace procedures

4.4 Workplace documentation is processed according to workplace procedures

Before competency can be determined, individuals must demonstrate they can perform the following according to the standards defined in this unit’s elements, performance criteria, range of conditions and foundation skills:

synchronise two different pieces of plant and equipment, in which the work must involve:

selecting synchronising procedures appropriate to the circumstances

synchronising the plant and equipment

testing and inspecting synchronised plant and equipment.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to synchronising plant and equipment, including procedures for:

operating engines

following electrical safety requirements

isolating and stabilising plant and equipment

environmental requirements, including procedures for trapping, storing and disposing of oils or fluids released from plant and equipment during synchronisation process

operating principles of plant and equipment and associated components, including:

electrical

hydraulic

mechanical

plant and equipment synchronisation procedures, including:

electrical:

connect and disconnect

electronic control module

electronic control of implement settings and adjustments

hydraulic:

connect and disconnect

pressure adjustment

fluid, leaks, and pressures

mechanical:

weight

power take-off (PTO)

three point linkage

towed implement

post-synchronisation testing procedures for plant and equipment, including operational test procedures.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to undertake synchronising operations

1.1 Job requirements are determined according to workplace instructions

1.2 Synchronisation procedures and information are sourced and interpreted

1.3 Options for synchronisation are analysed and those most appropriate to the circumstances are selected and prepared

1.4 Hazards associated with the work are identified and risks are managed

1.5 Synchronisation tools and equipment are selected and checked for serviceability

1.6 Technical and calibration requirements for synchronisation are sourced, and support equipment is identified and prepared

2. Conduct synchronising operations

2.1 Synchronising procedures are carried out according to manufacturer specifications, workplace procedures, and safety and environmental requirements

2.2 Synchronising documentation is completed and reported according to workplace procedures

3. Analyse results

3.1 Operational tests are carried out and results are compared with manufacturer specifications

3.2 Results are documented and reported according to workplace procedures

4. Complete work processes

4.1 Final inspection is made to ensure work is to workplace expectations and plant and equipment are presented ready for use, including protective guards, safety features and cowlings

4.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected

4.3 Tools and equipment are checked and stored according to workplace procedures

4.4 Workplace documentation is processed according to workplace procedures

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety and environmental requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

operating engines

following electrical safety requirements

isolating and stabilising plant and equipment

environmental requirements, including procedures for trapping, storing and disposing of oils or fluids released from plant and equipment during synchronisation process.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Job requirements are determined according to workplace instructions 
Synchronisation procedures and information are sourced and interpreted 
Options for synchronisation are analysed and those most appropriate to the circumstances are selected and prepared 
Hazards associated with the work are identified and risks are managed 
Synchronisation tools and equipment are selected and checked for serviceability 
Technical and calibration requirements for synchronisation are sourced, and support equipment is identified and prepared 
Synchronising procedures are carried out according to manufacturer specifications, workplace procedures, and safety and environmental requirements 
Synchronising documentation is completed and reported according to workplace procedures 
Operational tests are carried out and results are compared with manufacturer specifications 
Results are documented and reported according to workplace procedures 
Final inspection is made to ensure work is to workplace expectations and plant and equipment are presented ready for use, including protective guards, safety features and cowlings 
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected 
Tools and equipment are checked and stored according to workplace procedures 
Workplace documentation is processed according to workplace procedures 
Job requirements are determined according to workplace instructions 
Synchronisation procedures and information are sourced and interpreted 
Options for synchronisation are analysed and those most appropriate to the circumstances are selected and prepared 
Hazards associated with the work are identified and risks are managed 
Synchronisation tools and equipment are selected and checked for serviceability 
Technical and calibration requirements for synchronisation are sourced, and support equipment is identified and prepared 
Synchronising procedures are carried out according to manufacturer specifications, workplace procedures, and safety and environmental requirements 
Synchronising documentation is completed and reported according to workplace procedures 
Operational tests are carried out and results are compared with manufacturer specifications 
Results are documented and reported according to workplace procedures 
Final inspection is made to ensure work is to workplace expectations and plant and equipment are presented ready for use, including protective guards, safety features and cowlings 
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected 
Tools and equipment are checked and stored according to workplace procedures 
Workplace documentation is processed according to workplace procedures 

Forms

Assessment Cover Sheet

AURKTA001 - Synchronise plant and equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AURKTA001 - Synchronise plant and equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: