AURMGA001 Mapping and Delivery Guide
Set up and dismantle temporary work location and equipment at motor sport events

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency AURMGA001 - Set up and dismantle temporary work location and equipment at motor sport events
Description
Employability Skills
Learning Outcomes and Application This unit describes the performance outcomes required to set up a temporary work location and equipment at a motor sport event according to team requirements. It involves preparing, setting up and dismantling a temporary work location and equipment storage, laying out equipment, erecting team promotional signage, and setting up a functional workspace in the temporary location.It applies to those working in the motor sport industry.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must satisfy NVR/AQTF assessor requirements.

Competency is to be assessed in the workplace or a simulated environment that accurately reflects performance in a real workplace setting.

Assessment must include direct observation of tasks.

Where assessment of competency includes third-party evidence, individuals must provide evidence that links them to the motor sport events in which they have set up and dismantled temporary work locations and equipment, e.g. event sign-on sheet.

Assessors must verify performance evidence through questioning on skills and knowledge to ensure correct interpretation and application.

The following resources must be made available:

three different motor sport events, including one sanctioned event

motor sport event officiating documentation, including rules and regulations, safety procedures and event procedures

site instructions

temporary shelter

temporary shelter specifications and erection procedures

tools, equipment and materials appropriate for erecting temporary shelter

tools and equipment appropriate for setting up and dismantling temporary work locations and equipment at specific motor sport events.

Prerequisites/co-requisites
Competency Field Motor Sport
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare site
  • Site information and requirements are determined and confirmed with site supervisor or circuit manager
  • Security and confidentiality issues are considered and risk management measures selected
  • Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements
  • Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards
       
Element: Assemble temporary work shelter
  • Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures
  • Work shelter is sourced and fittings information interpreted
  • Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements
  • Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required
       
Element: Position equipment and tooling in work area
  • Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements
  • Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements
  • Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements
  • Problems with work area are identified and reported to appropriate persons according to team procedures as required
  • Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required
       
Element: Dismantle temporary work shelter
  • Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements
  • Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements
  • Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements
  • Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements
       
Element: Prepare site
  • Site information and requirements are determined and confirmed with site supervisor or circuit manager
  • Security and confidentiality issues are considered and risk management measures selected
  • Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements
  • Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards
       
Element: Assemble temporary work shelter
  • Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures
  • Work shelter is sourced and fittings information interpreted
  • Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements
  • Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required
       
Element: Position equipment and tooling in work area
  • Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements
  • Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements
  • Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements
  • Problems with work area are identified and reported to appropriate persons according to team procedures as required
  • Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required
       
Element: Dismantle temporary work shelter
  • Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements
  • Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements
  • Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements
  • Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare site

1.1 Site information and requirements are determined and confirmed with site supervisor or circuit manager

1.2 Security and confidentiality issues are considered and risk management measures selected

1.3 Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements

1.4 Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards

2. Assemble temporary work shelter

2.1 Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures

2.2 Work shelter is sourced and fittings information interpreted

2.3 Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements

2.4 Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required

3. Position equipment and tooling in work area

3.1 Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements

3.2 Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements

3.3 Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements

3.4 Problems with work area are identified and reported to appropriate persons according to team procedures as required

3.5 Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required

4. Dismantle temporary work shelter

4.1 Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements

4.2 Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements

4.3 Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements

4.4 Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements

Before competency can be determined, individuals must demonstrate they can perform the following according to the standards defined in this unit’s elements, performance criteria, range of conditions and foundation skills:

correctly set up and dismantle a temporary work location at three different motor sport event locations, including one sanctioned motor sport event.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to setting up and dismantling a temporary work location and equipment at a motor sport event, including procedures for:

selecting and using personal protective equipment (PPE)

identifying hazards and managing risks

key requirements of motor sport event category rules and supplementary regulations

principles and functionality requirements of the layout of temporary work shelter, including:

workflow of pit lane and service area operations

tooling and equipment required for specific events

methods of monitoring effectiveness of area layout

temporary shelter assembly and erection methods and techniques, including procedures for:

positioning equipment for ease of access, security, logical workflow and ergonomic use

setting up equipment for safe and effective operation, including:

correct boom height

securing gas bottles

securing service area moorings.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare site

1.1 Site information and requirements are determined and confirmed with site supervisor or circuit manager

1.2 Security and confidentiality issues are considered and risk management measures selected

1.3 Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements

1.4 Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards

2. Assemble temporary work shelter

2.1 Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures

2.2 Work shelter is sourced and fittings information interpreted

2.3 Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements

2.4 Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required

3. Position equipment and tooling in work area

3.1 Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements

3.2 Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements

3.3 Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements

3.4 Problems with work area are identified and reported to appropriate persons according to team procedures as required

3.5 Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required

4. Dismantle temporary work shelter

4.1 Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements

4.2 Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements

4.3 Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements

4.4 Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

selecting and using PPE

identifying hazards and managing risks.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Site information and requirements are determined and confirmed with site supervisor or circuit manager 
Security and confidentiality issues are considered and risk management measures selected 
Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements 
Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards 
Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures 
Work shelter is sourced and fittings information interpreted 
Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements 
Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required 
Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements 
Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements 
Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements 
Problems with work area are identified and reported to appropriate persons according to team procedures as required 
Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required 
Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements 
Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements 
Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements 
Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements 
Site information and requirements are determined and confirmed with site supervisor or circuit manager 
Security and confidentiality issues are considered and risk management measures selected 
Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements 
Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards 
Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures 
Work shelter is sourced and fittings information interpreted 
Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements 
Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required 
Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements 
Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements 
Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements 
Problems with work area are identified and reported to appropriate persons according to team procedures as required 
Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required 
Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements 
Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements 
Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements 
Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements 

Forms

Assessment Cover Sheet

AURMGA001 - Set up and dismantle temporary work location and equipment at motor sport events
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AURMGA001 - Set up and dismantle temporary work location and equipment at motor sport events

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: