Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
AURT301383A Mapping and Delivery Guide
Dismantle, assemble and repair engine block and sub-assemblies
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | AURT301383A - Dismantle, assemble and repair engine block and sub-assemblies |
---|---|---|---|
Description | This unit covers the competence required to dismantle and assemble an engine block and sub-assemblies to clearances and tolerances and to carry out repairs. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | The unit includes identification and confirmation of work requirement, preparation for work, dismantling, measuring and testing of engine block and sub-assembly components, repair, checking, assembling of engine block and sub-assemblies and completion of work finalisation processes, including clean-up and documentation.This competence relates to engine reconditioning in short and long motors and is to include engine components (crankshafts, camshafts, balance shafts, cylinder blocks/ barrels, cylinder liners (wet and dry), idler shafts, pistons, connecting rods, bearings, rings, gears, chains, belts, pulleys, oil pumps and cylinder head assemblies).Work requires individuals to demonstrate judgement and problem-solving skills in managing own work activities and contributing to a productive team environment.Work is carried out in accordance with award provisions. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to dismantle engine block and sub-assemblies |
| |||||||
Element: Dismantle engine block and sub-assemblies |
| |||||||
Element: Determine repair procedures |
| |||||||
Element: Prepare to assemble engine block |
| |||||||
Element: Check tolerances |
| |||||||
Element: Assemble engine block and sub-assemblies/fit cylinder head(s) |
| |||||||
Element: Carry out testing and adjustment procedures |
| |||||||
Element: Prepare equipment for use or storage |
|