Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

CPCCBC4043A Mapping and Delivery Guide
Operate a self-erecting tower crane

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency CPCCBC4043A - Operate a self-erecting tower crane
Description This unit of competency specifies the outcomes required to operate a self-erecting tower crane, including planning and preparing for work, conducting operational checks, safely and effectively operating the self-erecting tower crane for a range of tasks including lifting and moving loads, monitoring and shutting down in accordance with designated Australian standards.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit may have application in a range of industries, including automotive, defence, forests, maritime, metals and engineering, mining, transport and distribution, in addition to general construction.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Nil Nil
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for operation.
  • Applicable safety (OHS), licensing, legislative and organisational requirements relevant to operating a self-erecting tower crane are verified and complied with.
  • Work order is reviewed, confirmed and clarified with appropriate personnel.
  • Type of operations to be conducted with a self-erecting tower crane are assessed and prepared.
  • Equipment is selected appropriate to work requirements and checked for operational effectiveness in accordance with manufacturer recommendations.
  • Self-erecting tower crane operations are planned in accordance with site procedures.
  • Environmental protection measures are adhered to in accordance with environmental plans and regulations.
  • Communication with others is established and maintained in accordance with OHS requirements.
       
Element: Inspect and test self-erecting tower crane.
  • Self-erecting tower crane is visually inspected prior to operation for any evidence of damage, structural weakness or interference according to pre-operational safety check procedures and service logbook inspection.
  • Pre start-up checks are carried out on equipment in accordance with manufacturer recommendations and specifications.
  • Self-erecting tower crane controls and functions, including manoeuvrability, emergency functions, gear and accessories are checked for serviceability and any faults are rectified or reported.
  • Tower functions are checked after start-up and are monitored throughout operation.
  • Site hazards associated with self-erecting tower crane operations are detected and documented, risks assessed and safe operating techniques used to eliminate or control risks.
       
Element: Prepare for erection.
  • Self-erecting tower crane is positioned in accordance with work instructions, manufacturer specifications and statutory regulations.
  • Ground or base is assessed to ensure it will withstand crane operation without subsidence, in accordance with engineer specifications.
  • Barriers and signage are used to isolate the work area in accordance with safe work practices, load shifting requirements and the work plan.
  • Self-erecting tower crane is positioned to ensure a level operating platform in accordance with manufacturer instructions and statutory regulations.
  • Activities are coordinated with riggers, doggers and other crane operators.
  • Self-erection system is activated to achieve the required height of operation in accordance with manufacturer specifications.
  • Rig is handed over to riggers to complete erection and stability procedures.
       
Element: Operate self-erecting tower crane.
  • Self-erecting tower crane is operated with ground controls to work instructions and in accordance with company operating procedures and manufacturer specifications.
  • Communication practices associated with lifting and moving loads are conducted in accordance with work site procedures and are confirmed between parties.
  • Start-up and shutdown procedures are performed in accordance with manufacturer specifications and site requirements.
  • Weight of load is confirmed as complying with crane lifting capacity, operating radius and crane load chart.
  • Lifting gear is selected, inspected, attached and used in accordance with working load limits and OHS legislation.
  • Crane movements are checked for safe operation and load is prepared for lifting in accordance with crane, dogging and rigging requirements.
  • Load is manoeuvred to position using the control systems to manufacturer specifications and continually monitored throughout its travel, and tasks are completed effectively.
  • Load is lifted and moved in accordance with the agreed crane schedule and conventional hand and audible signals that meet OHS legislation and work site procedures.
  • Load is constantly monitored to ensure safety to personnel, load and structural stability, with monitoring systems and alarms immediately acted upon in accordance with site requirements.
       
Element: Shut down and stow self-erecting tower crane.
  • Self-erecting tower crane is shut down and stowed using the correct sequence of procedures in accordance with manufacturer recommendations and specifications.
  • Routine post-operational checks are carried out in accordance with manufacturer specifications.
  • Self-erection system is lowered by activating the recoil procedure or ram in accordance with manufacturer specifications.
  • Self-erecting tower crane operations and faults are recorded and reported to appropriate personnel.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed by providing evidence that the candidate can safely and efficiently conduct self-erecting tower crane operations according to organisational and regulatory requirements.

This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

comply with organisational and site policies and procedures, including quality requirements and state or territory legislation applicable to workplace operations.

comply with OHS and environmental regulations, policies and procedures

communicate effectively and work safely with others in the work area

conduct effective risk assessment and management procedures

complete the raising and lowering of the coil structure or ram

operate a self-erecting tower crane, including all functions to their maximum extension and travel in the lifting and moving of at least three differing load types (including different sizes, shapes, weights and materials) to different locations on the site

conduct pre and post-operational checks of the self-erecting tower crane.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

workplace location or simulated workplace

materials and equipment relevant to self-erecting tower crane operations

specifications and work instructions.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

communication skills to:

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

clarify and confirm work order with appropriate personnel

follow instructions

participate in on-site meetings

report faults and respond appropriately

read and interpret:

instructions

work orders

other relevant documentation

use a range of communication technologies and equipment

use and interpret non-verbal communication

use language and concepts appropriate to cultural differences

written skills to:

document hazards

record and report faults relating to self-erecting tower crane operations

comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for conducting self-erecting tower crane operations

efficiently and safely conduct self-erecting tower crane operations

inspect work plans (job safety analyses and safe work method statements) in accordance with legislation

numeracy skills to calculate rated capacity, working load limits and load charts

use and maintain relevant tools, machinery and equipment

verify problems and equipment faults and demonstrate appropriate response procedures.

Required knowledge

Required knowledge for this unit is:

environmental protection requirements relating to the disposal of waste material

established communication channels and protocols in the workplace

federal, state and territory OHS legislation, regulations, standards and codes of practice relevant to the full range of processes for conducting self-erecting tower crane operations

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS) and material handling methods

organisational and site standards, requirements, policies and procedures for conducting self-erecting tower crane operations

procedures for recording, reporting and maintaining workplace records and information

remote control operations and indicators

risk assessment and management

routine problems encountered with equipment use or adjustment and required corrective actions

self-erecting tower crane capabilities and gear

self-erecting tower crane operations and operating techniques

techniques for calculating rated capacity, working load limits and load charts

types of tools and equipment, and procedures for their use, operation and maintenance.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as disability are a factor

hazard control

hazardous materials and substances

housekeeping

organisational first aid

personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

air monitoring equipment

falling objects

man-made structures

obstructions

recently filled trenches

restricted access barriers

safe parking

security from unauthorised access or movement

traffic control

uneven or unstable surfaces or terrain

underground or overhead services

work site visitors and the public

working at heights

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

Licensing requirements include:

relevant recognition, permit, licence or permission to operate within any state or territory issued by the government regulatory authority of that jurisdiction.

Legislative requirements include:

award and organisation agreements and relevant industrial arrangements

confidentiality and privacy requirements

environmental issues

equal opportunity

industrial relations and anti-discrimination

OHS issues

relevant industry codes of practice

relevant legislation from all levels of government that affect business operation.

Organisational requirements include legal, organisational and site policy, guidelines and procedures relating to:

access and equity principles and practices

consultative processes

emergency and evacuation procedures

equipment maintenance and storage procedures

ethical standards

OHS policies

own role and responsibility

procedures and programs

quality and continuous improvement processes and standards

quality assurance or procedures manuals

recording and reporting procedures.

Work order includes:

organisational work specifications and instructions issued by authorised personnel for the operation of a self-erecting tower crane and its respective tasks.

Appropriate personnel includes:

client

colleague

manager

supervisor

supplier.

Self-erecting tower crane includes:

cranes with bales mounted in a triangular or nested configuration for transport

driven by electric or hydraulic mechanical systems

cranes of the telescopic ram type

involvement of riggers to:

stabilise the self-erecting tower crane with the use of plates and packing under the footplates to adequately distribute the load, ensuring the bearing capacity of the crane standing is not exceeded

conduct other erection activities, including the boom and counterweights

self-erecting systems with:

automatic locking mechanisms

braking systems

operator cabins designed to ascend and descend the erected tower

outriggers

ramps

remote control

self-levelling systems

stabilisers.

Equipment includes:

self-erecting tower cranes, lifting gear, workboxes and relevant maintenance equipment and may include remote control devices (pendant control and radio control)

procedures for equipment lock-out protecting operators and co-workers from accidental injury by isolating the equipment

emergency shutdown and stopping, extinguishing fires, organisational first aid requirements and evacuation.

Environmental protection measures include organisational and project requirements, including:

clean-up management

dust and noise

vibration

waste management.

Pre start-up checks are conducted to ensure:

equipment has been set up correctly

gear is fitted accurately

plant is operating to optimum performance and to manufacturer specifications.

Hazards include:

buildings

chemicals

fires

hazardous materials

movement of equipment, goods or material

structures

traffic

underground or overhead services

uneven or unstable surface or terrain.

Barriers and signage include:

barrier tape or netting

fencing

specified safety signage

temporary boundaries.

Riggers' role is to include:

process of fitting and removing booms, cables, spars and counterweights to ensure structural stability and load capacity of self-erecting tower cranes.

Doggers' role is to include:

provision of directional signals to the crane operator on the position and security of the load.

Stability is to ensure:

self-erecting tower crane is positioned and secured so as not to topple over during operations.

Ground controls include:

pendant controls

remote control devices.

Weight of load includes:

that prescribed by manufacturer as not exceeding the allowable capacity of the self-erecting tower crane.

Lifting gear includes:

chains

flexible steel wire rope slings

grabs

spreader beams

other slinging equipment.

Tasks include:

operations, including:

boom up and boom down and operation of attachments

luff movements

outriggers

slew left and right

telescope in and out

trolley in and trolley out

winch up and down in combination

service operations that provide for lighting, telecommunications and raised platforms for applications, including:

airports

entertainment

firefighting

harbours

law enforcement

mining

oil and gas exploration

road construction

search and rescue

sports.

Records and reports include:

conclusions

costs

dangerous occurrences or equipment malfunctions

difficulties or issues faced

environmental issues

hazards

incidents or injuries

maintenance of equipment

maintenance records

pro formas

production reports

recommendations, including for future work

results

self-erecting tower crane operations

using logbooks.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Applicable safety (OHS), licensing, legislative and organisational requirements relevant to operating a self-erecting tower crane are verified and complied with. 
Work order is reviewed, confirmed and clarified with appropriate personnel. 
Type of operations to be conducted with a self-erecting tower crane are assessed and prepared. 
Equipment is selected appropriate to work requirements and checked for operational effectiveness in accordance with manufacturer recommendations. 
Self-erecting tower crane operations are planned in accordance with site procedures. 
Environmental protection measures are adhered to in accordance with environmental plans and regulations. 
Communication with others is established and maintained in accordance with OHS requirements. 
Self-erecting tower crane is visually inspected prior to operation for any evidence of damage, structural weakness or interference according to pre-operational safety check procedures and service logbook inspection. 
Pre start-up checks are carried out on equipment in accordance with manufacturer recommendations and specifications. 
Self-erecting tower crane controls and functions, including manoeuvrability, emergency functions, gear and accessories are checked for serviceability and any faults are rectified or reported. 
Tower functions are checked after start-up and are monitored throughout operation. 
Site hazards associated with self-erecting tower crane operations are detected and documented, risks assessed and safe operating techniques used to eliminate or control risks. 
Self-erecting tower crane is positioned in accordance with work instructions, manufacturer specifications and statutory regulations. 
Ground or base is assessed to ensure it will withstand crane operation without subsidence, in accordance with engineer specifications. 
Barriers and signage are used to isolate the work area in accordance with safe work practices, load shifting requirements and the work plan. 
Self-erecting tower crane is positioned to ensure a level operating platform in accordance with manufacturer instructions and statutory regulations. 
Activities are coordinated with riggers, doggers and other crane operators. 
Self-erection system is activated to achieve the required height of operation in accordance with manufacturer specifications. 
Rig is handed over to riggers to complete erection and stability procedures. 
Self-erecting tower crane is operated with ground controls to work instructions and in accordance with company operating procedures and manufacturer specifications. 
Communication practices associated with lifting and moving loads are conducted in accordance with work site procedures and are confirmed between parties. 
Start-up and shutdown procedures are performed in accordance with manufacturer specifications and site requirements. 
Weight of load is confirmed as complying with crane lifting capacity, operating radius and crane load chart. 
Lifting gear is selected, inspected, attached and used in accordance with working load limits and OHS legislation. 
Crane movements are checked for safe operation and load is prepared for lifting in accordance with crane, dogging and rigging requirements. 
Load is manoeuvred to position using the control systems to manufacturer specifications and continually monitored throughout its travel, and tasks are completed effectively. 
Load is lifted and moved in accordance with the agreed crane schedule and conventional hand and audible signals that meet OHS legislation and work site procedures. 
Load is constantly monitored to ensure safety to personnel, load and structural stability, with monitoring systems and alarms immediately acted upon in accordance with site requirements. 
Self-erecting tower crane is shut down and stowed using the correct sequence of procedures in accordance with manufacturer recommendations and specifications. 
Routine post-operational checks are carried out in accordance with manufacturer specifications. 
Self-erection system is lowered by activating the recoil procedure or ram in accordance with manufacturer specifications. 
Self-erecting tower crane operations and faults are recorded and reported to appropriate personnel. 

Forms

Assessment Cover Sheet

CPCCBC4043A - Operate a self-erecting tower crane
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCBC4043A - Operate a self-erecting tower crane

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: