Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

CPCCCA3010A Mapping and Delivery Guide
Install and replace windows and doors

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency CPCCCA3010A - Install and replace windows and doors
Description This unit of competency specifies the outcomes required to plan, prepare, set out and install window and door units, and to replace window and door units to different types and styles of buildings for access, security, weather proofing and replacement of defective windows and doors. It includes timber and metal window and door units.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit of competency supports achievement of skills to install windows and doors in new or existing buildings for a range of construction projects, which includes working with others and as a member of a team.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry Nil
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare.
  • Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied using relevant information for planning and preparation purposes.
  • Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • Signage and barricade requirements are identified and implemented.
  • Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
  • Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  • Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
       
Element: Install window units to frame.
  • Window opening size is checked to be greater than overall window frame.
  • Reveals are joined and fixed securely to frames where specified.
  • Window unit is located to suit brickwork and eaves finish for veneer construction, whichever is applicable.
  • Window unit is positioned in place so that head/sill are level and stiles are plumb and in wind, ensuring reveals or frame are finished flush with face of inside wall lining.
  • Window is packed and fixed to wall frame through/to studs, in accordance with specified fixing and fastening methods.
       
Element: Replace window units/door frames.
  • Architraves and nosing are removed.
  • Sill bricks or cladding are removed where specified.
  • Fasteners are cut, packing removed and flashing detached from frame.
  • Window unit/ door frame is removed.
  • Window unit/door frame and window components are installed to plumb, level and wind.
  • Architraves and mouldings are replaced.
       
Element: Prepare door opening, and construct and fix jamb.
  • Door frame opening size is checked to be greater than the overall door jamb width and height, allowing for plumbing of stiles, thickness of floor covering, levelling of door head and level of floor.
  • Jamb stiles are marked and cut to length allowing for clearances according to specifications.
  • Head is trenched to accommodate jamb stiles allowing for clearance according to specification.
  • Jamb frame is assembled, squared and braced with rebates flush.
  • Joints and rebates are cleaned and finished to quality requirements.
       
Element: Install door and door unit.
  • Door unit is positioned in place so that the head/sill is level and stiles are plumb and in wind, ensuring reveals or frame finished flush with face of inside wall lining.
  • Door is fitted to jamb allowing for clearances according to specifications with lock stile door backed off to facilitate correct operation.
  • Hinges are marked out on door and jamb.
  • Hinges are fitted to door and jamb.
  • Final adjustments of door are made.
  • Door furniture components are fitted and fixed to manufacturer specifications.
       
Element: Clean up.
  • Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations

comply with organisational policies and procedures, including quality requirements

safely and effectively use tools, plant and equipment

communicate and work effectively and safely with others

install one standard window or glazed sliding door unit to specifications

replace one standard window or glazed sliding door unit to specifications

construct and fit one standard external rebated door jamb/frame to specifications

fit and hang one standard door, including the door furniture and a pair of doors with door jambs to specifications.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret:

documentation from a variety of sources

plans, specifications and drawings

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

numeracy skills to apply measurements and make calculations

organisational skills, including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

construction terminology

flashing requirements and installation techniques

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS)

materials storage and environmentally friendly waste management

plans, specifications and drawings

plant, tools and equipment types, characteristics, uses and limitation

processes for setting out

processes for the calculation of material requirements

quality requirements for windows and doors

window and door installation and replacement techniques

window and door materials

workplace and equipment safety requirements.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions where specified

memos

MSDS

organisation work specifications and requirements

plans and specifications

regulatory and legislative requirements pertaining to installing and replacing windows and doors

relevant Australian standards

safe work procedures related to installing and replacing windows and doors

signage

verbal or written and graphical instructions

work bulletins

work schedules.

Planning and preparation include:

work site inspection

equipment defect identification

assessment of conditions and hazards

determination of work requirements.

Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

handling of materials

hazard control

hazardous materials and substances

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

earth leakage boxes

lighting

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

working with dangerous materials

organisational first aid

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

use of firefighting equipment

use of tools and equipment

workplace environment and safety.

Tools and equipment include:

air compressors and hoses

bevels

chisels

hammers

hand saws

marking equipment

measuring tapes and rules

nail bags

nail guns

power drills

power leads

power saws

protractors

saw stools

scaffolding

spirit levels

squares (combination/tri)

stair clips and tables

steel squares and fences

string lines.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications, where specified

workplace operations and procedures.

Materials include:

barrel bolts

cabin hooks

closers

dead bolts

flash bolts

flashings

handles

hinges (butt and parliament)

latches

locks

metal

night latches

passage sets

timber.

Environmental requirements include:

clean-up protection

noise and dust

vibration

waste management.

Statutory and regulatory authorities include:

federal, state and local authorities administering applicable Acts, regulations and codes of practice.

Windows include:

all size windows

casement, double hung, hopper, straight and sliding, including glazed sliding doors, curved and bay.

Reveals:

may or may not be fitted with windows.

Door frames:

may be fixed first and then the door installed or doors may be fixed to the frame prior to installation

doors may be hung to timber or metal frames.

Window components include:

reveal

sill

trimmers.

Doors include:

flush panel, framed and panelled, and glazed

door units are to cover hinged door units and include standard doors, sliding, flywire, combination window/door units, door sidelight units (glazed or unglazed) and internal doors

door jambs, door stiles and door sills.

Door furniture components include:

grips, latches/deadlocks, push plates and closers

handles and locks.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied using relevant information for planning and preparation purposes. 
Safety (OHS) requirements are followed in accordance with safety plans and policies. 
Signage and barricade requirements are identified and implemented. 
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. 
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. 
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. 
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. 
Window opening size is checked to be greater than overall window frame. 
Reveals are joined and fixed securely to frames where specified. 
Window unit is located to suit brickwork and eaves finish for veneer construction, whichever is applicable. 
Window unit is positioned in place so that head/sill are level and stiles are plumb and in wind, ensuring reveals or frame are finished flush with face of inside wall lining. 
Window is packed and fixed to wall frame through/to studs, in accordance with specified fixing and fastening methods. 
Architraves and nosing are removed. 
Sill bricks or cladding are removed where specified. 
Fasteners are cut, packing removed and flashing detached from frame. 
Window unit/ door frame is removed. 
Window unit/door frame and window components are installed to plumb, level and wind. 
Architraves and mouldings are replaced. 
Door frame opening size is checked to be greater than the overall door jamb width and height, allowing for plumbing of stiles, thickness of floor covering, levelling of door head and level of floor. 
Jamb stiles are marked and cut to length allowing for clearances according to specifications. 
Head is trenched to accommodate jamb stiles allowing for clearance according to specification. 
Jamb frame is assembled, squared and braced with rebates flush. 
Joints and rebates are cleaned and finished to quality requirements. 
Door unit is positioned in place so that the head/sill is level and stiles are plumb and in wind, ensuring reveals or frame finished flush with face of inside wall lining. 
Door is fitted to jamb allowing for clearances according to specifications with lock stile door backed off to facilitate correct operation. 
Hinges are marked out on door and jamb. 
Hinges are fitted to door and jamb. 
Final adjustments of door are made. 
Door furniture components are fitted and fixed to manufacturer specifications. 
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. 

Forms

Assessment Cover Sheet

CPCCCA3010A - Install and replace windows and doors
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCCA3010A - Install and replace windows and doors

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: