CPCCCA3020A Mapping and Delivery Guide
Erect and dismantle jump form formwork

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency CPCCCA3020A - Erect and dismantle jump form formwork
Description This unit of competency specifies the outcomes required to erect and dismantle jump form formwork to form wall structures where the formwork process is continuous. It includes curved or straight jump form formwork.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit of competency supports achievement of skills to erect and take down jump form formwork for placing concrete in a range of construction projects. Jump form formwork requires work as a member of a mixed trades team, including carpenters, riggers, electricians, concreters and steel fixers.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry Nil
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare.
  • Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes.
  • Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • Signage and barricade requirements are identified and implemented.
  • Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
  • Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  • Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
       
Element: Set out formwork.
  • Set out points and lines are located according to engineer's drawings, survey datum points and site plan for formwork erection.
  • Jump form formwork positioning is located to predetermined set out.
       
Element: Assemble core form system.
  • Internal prefabricated system wall form shutters are erected and fixed into location according to engineer's drawings.
  • System is fitted to concrete nib walls to heights consistent with engineer's requirements.
  • Shear key feet are installed to manufacturer specifications.
  • Platforms and assembly are fitted into core to manufacturer specifications.
  • Structural steel system grid work and hydraulic hose lines are fitted according to manufacturer specifications.
  • Wall form shutters are suspended and system cladding and platforms are fitted and completed according to manufacturer specifications and engineer's requirements.
       
Element: Locate and install penetrations.
  • Locations and dimensions of penetrations are set out in accordance with designated tolerance from engineering drawings.
  • Penetrations, block-outs and cast-in services are constructed where required to engineering drawings.
  • Penetrations are installed to requirements of engineering drawings.
       
Element: Conduct jump system.
  • External prefabricated system wall shutters are erected and fixed to engineer's and manufacturer specifications.
  • Shutters are loosened and stripped according to manufacturers' and OHS requirements.
  • Rigger is communicated with to activate electrical/hydraulic jacking of the system to the new position.
  • Trailing platforms are installed to engineer's specifications.
  • Formwork is dismantled in accordance with manufacturer and engineer's specifications.
       
Element: Clean up.
  • Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations

comply with organisational policies and procedures, including quality requirements

safely and effectively use tools, plant and equipment

communicate and work effectively and safely with others

complete, as part of a team, the erection and dismantling of jump form formwork for one operation.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret:

documentation from a variety of sources

plans, specifications and drawings

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

numeracy skills to apply measurements and make calculations

organisational skills, including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

common formwork faults, problems and suitable rectifications

concrete characteristics and properties in formwork

construction terminology

electrical/hydraulic jacking systems

formwork materials and techniques

hydraulic pressures applied to formwork

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS)

materials storage and environmentally friendly waste management

plans, specifications and drawings

plant, tools and equipment types, characteristics, uses and limitation

processes for the calculation of material requirements

quality requirements for jump form formwork

workplace and equipment safety requirements.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions where specified

memos

MSDS

organisation work specifications and requirements

plans and specifications

regulatory and legislative requirements pertaining to erecting and dismantling jump form formwork

relevant Australian standards

safe work procedures related to erecting and dismantling jump form formwork

signage

verbal or written and graphical instructions

work bulletins

work schedules.

Planning and preparation include:

work site inspection

equipment defect identification

assessment of conditions and hazards

determination of work requirements.

Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

handling of materials

hazard control

hazardous materials and substances

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

earth leakage boxes

lighting

personnel

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working with dangerous materials

organisational first aid

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

use of firefighting equipment

use of tools and equipment

workplace environment and safety.

Tools and equipment include:

air compressors and hoses

chisels

hammers

levelling equipment

measuring tapes and rules

nail bags

pneumatic wrenches

power drills

power leads

proprietary jump form formwork

spanners

spirit levels.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications, where specified

workplace operations and procedures.

Materials include:

formwork system components and bolts.

Environmental requirements include:

clean-up protection

noise and dust

vibration

waste management.

Statutory and regulatory authorities include:

federal, state and local authorities administering applicable Acts, regulations and codes of practice.

Formwork:

includes prefabricated or in situ, but is to be rigid to withstand the mass of wet concrete and actions imposed during placement

for construction of formwork it is critical to comply with regulations and specifications for height, level and loadings

includes timber, metal and includes prefabricated components.

Jump form formwork:

is formwork which is initially erected and then moved (jumped) up to its next position as a whole system

may apply to cores, walls, silos, chimneys or lift shafts.

Penetrations, block-outs and cast-in services:

make provision for services by other contractors

may be construction of timber, metal, styrene foam or prefabricated.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. 
Safety (OHS) requirements are followed in accordance with safety plans and policies. 
Signage and barricade requirements are identified and implemented. 
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. 
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. 
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. 
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. 
Set out points and lines are located according to engineer's drawings, survey datum points and site plan for formwork erection. 
Jump form formwork positioning is located to predetermined set out. 
Internal prefabricated system wall form shutters are erected and fixed into location according to engineer's drawings. 
System is fitted to concrete nib walls to heights consistent with engineer's requirements. 
Shear key feet are installed to manufacturer specifications. 
Platforms and assembly are fitted into core to manufacturer specifications. 
Structural steel system grid work and hydraulic hose lines are fitted according to manufacturer specifications. 
Wall form shutters are suspended and system cladding and platforms are fitted and completed according to manufacturer specifications and engineer's requirements. 
Locations and dimensions of penetrations are set out in accordance with designated tolerance from engineering drawings. 
Penetrations, block-outs and cast-in services are constructed where required to engineering drawings. 
Penetrations are installed to requirements of engineering drawings. 
External prefabricated system wall shutters are erected and fixed to engineer's and manufacturer specifications. 
Shutters are loosened and stripped according to manufacturers' and OHS requirements. 
Rigger is communicated with to activate electrical/hydraulic jacking of the system to the new position. 
Trailing platforms are installed to engineer's specifications. 
Formwork is dismantled in accordance with manufacturer and engineer's specifications. 
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. 

Forms

Assessment Cover Sheet

CPCCCA3020A - Erect and dismantle jump form formwork
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCCA3020A - Erect and dismantle jump form formwork

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: