CPCCCM3001 Mapping and Delivery Guide
Operate elevated work platforms up to 11 metres
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | CPCCCM3001 - Operate elevated work platforms up to 11 metres |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit of competency specifies the outcomes required to operate specific types of elevated work platforms (EWPs) safely and effectively in different locations, including on uneven terrain. The unit includes locating, setting up, operating and shutting down scissor lifts and self-propelled boom lifts with a boom length under 11 metres.The unit supports construction workers in the safe and effective operation of electrical, hydraulic and mechanical EWPs. The unit does not cover truck-mounted EWPs, powered telescoping devices, hinged devices or articulated devices, or any combination of these used to support a platform on which personnel, equipment and materials may be elevated to perform work and which has a boom length of 11 metres or more. It applies to construction work on residential and commercial work sites in new construction, renovation or refurbishment, and maintenance projects. Licensing, legislative, regulatory or certification requirements apply to this unit in some States. Relevant state and territory regulatory authorities should be consulted to confirm those requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. Suitable assessment of performance requires: equipment: EWPs extension leads safety harnesses and lanyards special attachments for the EWP when shifting equipment PPE prescribed under legislation, regulations, codes of practice and workplace policies and practices materials: logbooks service manuals operator manuals contingencies: uneven terrain specifications: AS 2550 Set: Cranes, hoists and winches - Safe use job specifications manufacturer specifications SWMS physical conditions: different weather conditions relationship with team members and supervisor: work is conducted as part of a team timeframe: according to job requirements. Assessor requirements As a minimum, assessors must satisfy the assessor requirements in the Standards for Registered Training Organisations (RTOs) current at the time of assessment. |
||
Prerequisites/co-requisites | |||
Competency Field | Common |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare. |
| |||||||
Element: Locate EWP in place. |
| |||||||
Element: Work site is inspected and terrain level checked to determine stabilising and safe working area requirements. | ||||||||
Element: Work site conditions and hazards are assessed and site health and safety requirements confirmed and applied to planning. | ||||||||
Element: Safe work method statement (SWMS) for the type of EWP and job and work site requirements is reviewed with relevant personnel and confirmed. | ||||||||
Element: Plant, tools and equipment, including personal protective equipment (PPE), are selected according to job requirements, checked for serviceability, and faults are rectified or reported before starting work. | ||||||||
Element: Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. | ||||||||
Element: Verbal and non-verbal communication signals are confirmed with team members, supervisor, and other personnel working on site, as required. | ||||||||
Element: Rescue plan, including use of fall arrest system, is established and practised before using EWP. | ||||||||
Element: Conduct routine checks of EWP. |
| |||||||
Element: Routine pre-operational equipment checks are carried out according to operator manual or manufacturer specifications, and logbooks for defect checks and EWP maintenance schedules. | ||||||||
Element: Equipment is switched on in line with start-up procedures, and controls are checked for correct operation and ease of movement. | ||||||||
Element: EWP is checked to ensure that emergency safety devicesspecified in operator manual are present and operating correctly. |
| |||||||
Element: Tools, equipment and materials are placed into bucket or on platform according to job application requirements. | ||||||||
Element: Elevate platform to work location. |
| |||||||
Element: EWP controls are operated according to manufacturer recommendations and platform is elevated to work position. | ||||||||
Element: Power is switched off where specified and locking devices are engaged according to operator manual. | ||||||||
Element: Work is carried out according to job specification, operator manual, and health and safety requirements. | ||||||||
Element: Lower platform and shut down. |
| |||||||
Element: Shut-down procedures are carried out according to operator manual instructions and equipment is switched off. |
| |||||||
Element: EWP, tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices. | ||||||||
Element: Work completion procedures are applied and relevant personnel notified that work is finished. |