Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPCCSP3001A Mapping and Delivery Guide
Apply float and render to straight and curved surfaces
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | CPCCSP3001A - Apply float and render to straight and curved surfaces |
---|---|---|---|
Description | This unit of competency specifies the outcomes required to float, render and finish flat and curved solid plastering work.It includes planning and preparation for the work, preparation of templates, preparation of the background surface, application of floating and rendering to flat and curved surfaces and to piers, finishing of the rendering coats, and post work clean-up activities. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | This unit supports the attainment of skills and knowledge to apply floated or rendered materials to a range of straight and curved construction surfaces, which includes working with others and as a member of a team. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry Nil | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare. |
| |||||||
Element: Prepare templates for curved work or circular columns. |
| |||||||
Element: Prepare background surface. |
| |||||||
Element: Apply floating and rendering to flat and curved surfaces. |
| |||||||
Element: Apply floating and rendering coats to piers. |
| |||||||
Element: Apply floating coat within metal beading. |
| |||||||
Element: Finish rendering coats on flat walls, piers and curved work. |
| |||||||
Element: Clean up. |
|