Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

CPCCWF3007A Mapping and Delivery Guide
Tile curved surfaces

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency CPCCWF3007A - Tile curved surfaces
Description This unit of competency specifies the outcomes required to tile curved surfaces on solid and sheet substrate, using mortar or adhesive.It includes the preparation for and tiling of curved wall and floor surfaces, columns, circular walls and arches.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit of competency supports the attainment of skills and knowledge to tile curved surfaces while working with others as a member of a team.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry Nil
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare.
  • Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  • Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • Signage and barricade requirements are identified and implemented.
  • Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  • Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
  • Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
       
Element: Tile curved wall and floor surfaces.
  • Extent of curve is established from site inspection.
  • Levelling equipment is used for intermediate marking to level line set out around wall.
  • Location of tiles is set out to determine balanced design and identify cutting requirements.
  • Template is made to form an accurate curve line for tiled surface around wall.
  • Required method of laying tiles is determined by identification of location of first tile.
  • Mortar and/or adhesive is prepared where applicable to manufacturer specifications.
  • Pad tiles are fixed to level set out, template curve and specifications.
  • Minimum voids are maintained in mortar tile beds and tiles are fixed level, plumb (wall), flush and square.
  • Floor tiles are laid to set out grid with perimeter tiles marked and cut to fit curved wall.
  • Grout is mixed and applied to joints according to specifications, to provide flush and smooth finish.
  • Tiled surface is polished to specifications.
       
Element: Tile circular columns, walls and arches.
  • Template is set out and cut to ensure conformity to tile surface for curve.
  • Pad tiles are positioned accurately and fixed to line, to maintain uniform spacing.
  • Tiles are marked out accurately where applicable and fixed into place, to specifications.
  • Tiles are fixed on walls, plumb, maintaining levels and curvature of wall to specifications.
  • Line and curvature are maintained to specifications when fixing tiles to archways.
  • Grout is mixed and applied to joints, and tile surface is finished to specifications.
       
Element: Clean up.
  • Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations

comply with organisational policies and procedures including quality requirements

safely and effectively operate and use tools, plant and equipment

communicate and work effectively and safely with others

as a minimum, tile a circular concrete column of a minimum of 360mm diameter and 1m high abutting a concrete flat wall, continuing the tiling to the floor (to 150mm radius) from the column; and tile a standard door archway in a fibre cement sheet wall, including vertical returns and soffit; ensuring:

correct identification of requirement and completion of the tiling

correct selection and use of appropriate processes, tools and equipment

completing all work to specification

compliance with regulations, standards and organisational quality procedures and processes.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

workplace location or simulated workplace

materials relevant to tiling curved surfaces

hand and power tools, plant and equipment appropriate to tiling curved surfaces

realistic activities covering the mandatory task requirements

specifications and work instructions.

Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

communication skills to:

follow instructions

read and interpret:

documentation from a variety of sources

drawings and specifications

recognise procedures

report faults

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

written skills to record results of checks and tests and relevant work completion procedures

evaluate own actions and make judgments about performance and necessary improvements

identifying and accurately reporting to appropriate personnel any faults in tools, equipment or materials

organisational skills, including the ability to plan and set out work

respond to change and contribute to workplace responsibilities, such as current work site environmental and sustainability frameworks and management systems

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

general construction terminology

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS) and hazards associated with solvents, adhesives and cement or epoxy-based grouts

materials storage and environmentally friendly waste management

measurement and calculations

plans, drawings and specifications

plant, tools and equipment types, characteristics, uses and limitations

processes for the calculation of material requirements

quality requirements

techniques for setting out and fixing tiles to curved surfaces

tiling materials, including tiles, adhesives, mortar, grouting and substrates, their qualities, characteristics, preparation, techniques, applications, limitations and finishing

workplace and equipment safety requirements.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions, where specified

MSDS

memos

regulatory and legislative requirements pertaining to tiling curved surfaces

relevant Australian standards

safe work procedures relating to tiling curved surfaces

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Planning and preparation include:

assessment of conditions and hazards

determination of work requirements and safety plans and policies

equipment defect identification

work site inspection.

Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

hazard control

hazardous materials and substances

organisational first aid

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

concealed services (water, power and gas)

lighting

traffic control

restricted access barriers

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

Tools and equipment:

include:

brooms

brushes

buckets

caulking guns

cement sheet cutters

hammers

hose and water sprays

ladders

levelling equipment

lump hammers

measuring tapes and rules

mortar boards

nippers

pointed grouters

power drills

power leads

rags

rubber mallets

sanding blocks

saws

scrapers

shovels

spacers and wedges

spatulas

sponges

squares

squeegees

straight edges

stringlines

templates

tile cutters and scribes

trowels

wet and dry diamond saws

wheelbarrows

wire brushes

wooden floats

may include:

concrete mixers

masonry drill bits

power grinders

power sanders.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications

workplace operations and procedures.

Materials include:

adhesives

caulking compound

cement mortar (with and without additives)

grout

tiles.

Environmental requirements include:

clean-up management

dust and noise

vibration

waste management.

Templates are made from:

hardboard

plywood

sheet metal.

Wall surfaces include:

approved waterproof surfaces

blockwork

brickwork

concrete

fibre cement sheet

rendered surfaces

timber.

Types of tiles include:

ceramic

glass

granite

marble

porcelain

stone

terracotta.

Tiles are fixed using:

adhesives

cement mortar

cement mortar with adhesive additive.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. 
Safety (OHS) requirements are followed in accordance with safety plans and policies. 
Signage and barricade requirements are identified and implemented. 
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. 
Material quantity requirements are calculated in accordance with plans and specifications and quality requirements. 
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. 
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. 
Extent of curve is established from site inspection. 
Levelling equipment is used for intermediate marking to level line set out around wall. 
Location of tiles is set out to determine balanced design and identify cutting requirements. 
Template is made to form an accurate curve line for tiled surface around wall. 
Required method of laying tiles is determined by identification of location of first tile. 
Mortar and/or adhesive is prepared where applicable to manufacturer specifications. 
Pad tiles are fixed to level set out, template curve and specifications. 
Minimum voids are maintained in mortar tile beds and tiles are fixed level, plumb (wall), flush and square. 
Floor tiles are laid to set out grid with perimeter tiles marked and cut to fit curved wall. 
Grout is mixed and applied to joints according to specifications, to provide flush and smooth finish. 
Tiled surface is polished to specifications. 
Template is set out and cut to ensure conformity to tile surface for curve. 
Pad tiles are positioned accurately and fixed to line, to maintain uniform spacing. 
Tiles are marked out accurately where applicable and fixed into place, to specifications. 
Tiles are fixed on walls, plumb, maintaining levels and curvature of wall to specifications. 
Line and curvature are maintained to specifications when fixing tiles to archways. 
Grout is mixed and applied to joints, and tile surface is finished to specifications. 
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. 

Forms

Assessment Cover Sheet

CPCCWF3007A - Tile curved surfaces
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCWF3007A - Tile curved surfaces

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: